Laserfiche WebLink
2. Dimensions and specifications of all metal or material. <br /> (c) Model number and location. <br /> (d) Test data and results. <br /> (e) Letter from a registered engineer registered in the state of the product manufacturer or <br /> State of Florida certifying test results. <br /> (� Installation instructions. Installation instructions are required to be shipped with each <br /> product. <br /> (8) All anchors,piers, and tie-down components shall be recertified when there is a a <br /> change in design or material. <br /> (9) If the manufacturer or producer request these tests to be conducted out of state, all <br /> expenses(travel and per diem) shall be paid be the manufacturer or producer. <br /> Specific Authority 320.011, 320.824(1), 320.8325(2), F.S. Law Implemented 320.77(10), <br /> 320.822(12), 320.8285, 320.8325, 320.835(2),F.S.History—New 1-10-94,Amended 10-02-95. <br /> 15C-1.0106 Pier Specifications. <br /> (1) Each pier shall be required to withstand 2500 pounds plus a 2.5 safety factor from a <br /> vertical projection and from a horizontal projection equal to the same angle or degree of angle of <br /> the leg or support,using the same weight and safety factor. Three(3) consecutive tests must be <br /> performed without a failure. (Horizontal projection test not required on piers of less than twelve <br /> inches(12") in height including adjustment.) <br /> (2) Piers manufactured with adjustable heights shall be tested at m�imum heights. Test <br /> results shall be reported in the format shown in Example No. I. <br /> 20 <br />