My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
16-17509
Zephyrhills
>
Building Department
>
Permits
>
2016
>
16-17509
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2017 1:42:50 PM
Creation date
11/2/2016 9:53:47 AM
Metadata
Fields
Template:
Building Department
Company Name
OAK PARK
Building Department - Doc Type
Permit
Permit #
16-17509
Building Department - Name
KIEPER,JAMES & RHONDA & CROOK IRL F
Address
6034 12TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
; , �. <br /> ' : • Monitoring of Crawlspace Stabilization RE&A Project No. 2828-15-058-ER <br /> Peterson Residence Mav 13, 2016 <br /> Smart Jack Installation <br /> Six (6) Smart Jack crawlspace stabilizer piers (SJ-1 through SJ-6) were proposed by RE&A for <br /> the crawlspace of the structure. A total of six (6) Smart Jacks (SJ-1 through SJ-6)were installed <br /> by LRE. <br /> The piers were installed in accordance with industry standards. For specific da.ta and pier <br /> locations as built, please refer to the attached As-Built Foundation Stabilization Plans (Sheet <br /> AB-1 &AB-2). <br /> After the final lift, pressure was applied and the system locked into place on their respective <br /> installation date. All of the piers were mechanically jacked to ensure that they all remained <br /> loaded. The crawlspace was stabilized through the pier installation process at those locations <br /> where the piers were installed. <br /> It is our professional opinion that with the above stabilization of the foundation the structure <br /> should continue to perform as designed. Should additional movement be observed, additional <br /> stabilization may be required. <br /> It needs to be noted that the above remedial process does not seal off the top of the karst <br /> limestone or minimize the ability of the overlying soils from raveling into the limestone, nor <br /> does it inhibit any shrink/swell activity in underlying highly plastic clay layers. Also, the Smart <br /> Jack installation only address the foundation system at those locations that were supported. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.