: _ -� � <br /> Cu�b Site Conditian &Recommendations <br /> • Existing curti does not exist, new chitler requires iristall of an equipment curb, 8"-10"tall with <br /> aluminum�cap for the new chiller,wind tie down detail to concrete deck as required. <br /> • Roofing.is to be done bjr others and is shown below, included is an add cost for the flat roof <br /> and flashing of the deck and repairs shown below. <br /> • Provide permit wind hold down documents. <br /> Water lines <br /> • ChiBed Water lines are 1'/a'and will be ceconnected to new Dimplex chiller. <br /> • City water to the chiller is 3%"water line wil�be reused as the city by pass water line. <br />' • Drain from the by-pass is 1'/" <br /> • 'Provide new plumbing from existing .conr+ections on roof to new chiller WCP and auto , <br /> transfer box with new valves, weather cover and fittings/insulation as needed. �, <br /> Ghiller <br /> • Provide and ins#all 7-'/z ton Dimplex chiller as required with custom fabricated. equipment <br /> curb with wind liold down to ezisting building structure and secure chiller ta curb as cletailed. <br /> • Provide transfer panel to be mounted on the.rooftop vertical wall section by the chiller. <br /> • Provide indoor alarms as required for equipment failure; we found an abandoned .conduit <br /> ancl this is being assumed for use to�provide WCP operational status.in control room befow. <br /> � Elect�ical Conduit needed is to be run by others and is not included. <br /> • Electrical work needed with hook-up and upgrades to ctiillers by ofhers and are not included. <br /> in this proposal, see allowance foflowing <br /> • Provide glycol for new chiller as needed vuith factory start,warranfy and commissioning. <br /> Misceltaneous ifems <br /> • All wo"rk must b�done after hours with crane scheduled for Safiurday in scope <br /> Labor& Materia(s-7,5=ton 90,Q00-btuh.chiller, see Dimplex spec.sheet $ 38;560:00 <br /> Labor& Materials-7.5-ton 1NCP& Hardware-see Dimplex spec sheet $ 8;250.00 <br /> Labor&Materials-Plumbing &Piping-VVCP &VUater Line � 3,27D.00. <br /> Labor&Materials-Equiprrient Curb, Structural Hold Down, & Roofing $ 1,930_00 <br /> Labor 8�Materials=Roof�Surface Repairs to Flat Deck.and Parapet Flashings $ -T8D- <br /> Sealed Permit Drawings-Permit& (nspections � 900.00 <br /> Propylene Glyco!-40-gallons $ 1,120.00 <br /> Factory Certified Equipment Start, 15`Yr Maintenance, 1'/Z Years Paits&Labor $ 3,850.00 <br /> Eiectrical Allowance& Contingency Budget $ 85D.Q0 <br /> Alternate Roofinq Upqrade-RepairslReplacement <br /> Cirsco Scope-Roof RepairlReplacement $ 6,157.00 <br />' 15% OFi, MU, Plans, Doouments&Permit � 923.55 <br /> CGM Scope=&WCP Rack/Curb $ 1 145 00 <br /> Tota( Labor& Materials $ 66,955.55 <br /> If yau have any questions or comments,.p{ease call at your convenience. <br /> Sincerely yours, <br /> Mike Charles <br /> President/OwnerIUSF Bull <br /> Tony Thompson <br /> Installation Supervisor <br />