My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
16-16994
Zephyrhills
>
Building Department
>
Permits
>
2016
>
16-16994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 7:47:08 AM
Creation date
2/17/2017 7:47:06 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
16-16994
Building Department - Name
ZANIOS JR,CHRIS
Address
37945 7TH AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( �( � � <br /> s , ` •E; <br /> , ' / �` ,f::j p • <br /> ti� w��,�a.�,�� �� ������� � �� <br /> �ylx �g ��;� <br /> C.7la� � ��. .:���-y:,���� <br /> ���_. <br /> Installation of Panels <br /> Roof Pitch <br /> Gulf Coast Supply's engineering requires a minimum pitch of 2/12 for wood frame <br /> construction,and 1/a112 for steel frame, to ensure proper water drainage. A 2/12 pitch means that the <br /> minimum roof slope required for all panels is 2 inches of vertical rise per horizontal foot. Buryl sealant <br /> with lap screws is required on all side panel laps on roofs with less than a 4/12 pitch to prevent water <br /> from siphoning over the ribs (see Figure 7 on page 6),but is optional on roofs with a 4/12 pitch or <br /> greater. Consult our representative for recommendations for your particular roof pitch, and about <br /> roofing options if you have less than a 2/12 pitch. <br /> Roof Preparation <br /> Oil-canning is a wave-like,rippled appearance extending up the length of the panel after it has <br /> been installed on the roof. Any irregularities in the roof,including uneven plywood joints, warped <br /> plywood, uneven trusses,poor application of underlayment, the use of button caps with felt paper, etc., <br /> can promote oil-canning. Care should be taken to provide a flat,uniform surface on which to attach <br /> the panels. See page 8 for more details. <br /> Roof.Application <br /> Panel installation should begin at the gable end of'the roof opposite the prevailing rain-bearing <br /> wind(this will provide added assurance against wind-driven rain being forced under the laps). Measure <br /> one full panel width in (approx. 38")from the roof edge. At this point chalk a line from ridge to eave <br /> (avoid getting chalk on panels—it may discolor them!): Place the leading edge of the first panel <br /> along this line.It is extremely important that this panel be laid square to the eave and ridge so that the <br /> remaining panels will.line up square on the roof frame.If is wise to have a person at the eave and at the <br /> ridge to ensure that the proper panel coverage is being maintained across the roof. Also be sure that the <br /> panels are properly side-lapped(again, see fig. 7 on page 6). <br /> In applications where end-lapping is necessary, the upper panel on the slope should lap over the <br /> panel that is lower on the slope. Lower roof pitch requires a greater amount of panel overlap. All end- _ <br /> lap applications require two horizontal rows (across the panel) of butyl sealant tape and proper fastening <br /> to provide a maximum water seal. <br /> An overhang of 2 to 3 inches is recommended to provide a drip edge, while only 1 inch overhang <br /> is necessary where gutters are used (see p. IS). The open panel ribs at the eave can be sealed with inside <br /> closures. For maximum weather-tightness, a row of butyl tape can�be applied above and beneath inside <br /> closures. <br /> 1�imming and Cutting Steel Panels , <br /> The best device for cutting steel panels across the profile is eitlier a portable or hand shear, or a <br /> nibbler. Nibblers,however, and especially Carborundum blades on electric saws, do have a tendency to <br /> either leave hot metal particles that can burn paint surfaces or leave rust marks on panels and trim. The �, <br /> same is true of any filings left on the roof caused by the application of screws. Care should be taken to , <br /> brush all such particles from roof surfaces-after applicarion. . � <br /> To cut panels lengthwise: Note carefully where the panel is to be cut, and, using a straight-edge, ' <br /> score deeply dowri the length of the panel with a sharp-pointed utility knife.Folding the panel along the <br /> score mark, and bending back again if necessary, should produce a clean break in the panel. <br /> � ' - <br /> I CAUTION! clean,':all metal shavings and°particles off of roof to:avoid,unsightly rust stains <br /> (352) 498-0778 • Toll Free (888) 393-0335 • FAX (352) 498-7852 <br /> - 3 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.