My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
16-17017
Zephyrhills
>
Building Department
>
Permits
>
2016
>
16-17017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 8:24:37 AM
Creation date
2/17/2017 8:24:36 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
16-17017
Building Department - Name
NATIONSTAR MORGAGE LLC
Address
5721 20TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��,�,_� �,.� <br /> ���� � : � � � _.� mcs wo#M9411691 <br /> �i,:a�����.,cu.��a,u.:���:�:s��x,,. Customer: 501 � Cllent WO#: Type:Bid Approval(ExpiredBic <br /> To: CHAD WILCHITE INC Loan Num6er: *****6688 <br /> 6599'STATE ROAD 21.NORTH Loan Types CONV(43) ' ..'".. ' . ' ' <br /> KEYST,ONE'HEIGHTS,FL.32656 Ordered Date: Monday,January.25,201'6 KEETCH, RYAN • <br /> 3524730095. 'Due Date:. Friday�,Feb�uary 05; 2016 � 5721 20TH ST <br /> - ..• . <br /> Sale Date: ZEPHYRHILLS, FL 33542 <br /> � �Keypad,Code: Investor Type: FANNIE MAE(FNMA) Add'I Bldg(s): <br /> Phone: <br /> Communiry: Access Note; Lockbox Code:6688 <br /> Comments:Current keycode(s)/location(s)are:A389 Padlock/Back."'"Bid approval based on valid bid(s)submitted on WO#M9319422 fiy V1748,sent to tlie Investor for <br /> review�-and approved for the;full.amount within the 90'day bid submission timeframes. See�work order notes for approval amount for invoicing.Thank you!*** <br /> **�'"pISCLAIMEFt: Please advise,good BEFORE, DURING and-AFTER.photos MUST be provided to support the work completed to en"sure all work done to scope of <br /> approval.:Photos are to include wide angle shot of the entire area.being addressed to support all 3 scenarios(before/during/after)as well as closer photos as needed to <br /> supporf all 3 scenarios,(before/during/after);if this is not received vendorswill.potentially be held.responsible for returning to the property to take additional photos to support <br /> and or.complete additional.wo�k.that cannot be confirmed from phofos,atcost,to ensure all work was and is completed. Completion photos MUST match the areas that <br /> were bid for and shown in the bid ptiotos. DO NOT submit unreadable orblurry photos to support work done.Tliank you! <br /> "**If the�e are any issuesor concerns a.t alf regarding this WO, please call'me,;Evan•Barnabei,at 214-45:1-0932.between the hours of 8:00 AM-'5:00 PM(.Central Time)for <br /> assistance. If i dont not an'swer please leave a VM and,i will get bacK to you ASAF.Tfiank You!'"*Last Gra's"s Cut Date: 1%4/2016 Last Winterization Date: 10/9/2015 <br /> �- . . . . <br /> �Replace Roof Edge Metal.- FART 7 ROOF REPLACEMENT.BID:.REP_LACE 145.LF OF 3"DRIP EDGE. <br /> -Galvariized-3in x 3irr <br /> Replace Ridge Cap�-Asphalt PART 11 ROOF REPLACEMENT BID: REPLACE;(4)ADDITI.ONAL 10 LF SECTIONS:OF RIDGE CAP <br /> SHingle-.Eacfi Additional 10ft USING ASPHALT SHINGCES. <br /> Section-.Includes�Removal <br /> Replace Ridge Cap-Asphalt PART 10 ROOF REPLACEMENT BID: REPLACE FIRST 10 LF SECTION OE.RIDGE CAP USING <br /> Shingle-1st 1 Oft Section- O ASPHALT'SHINGLES. <br /> Includes.Removal <br /> Replace Felt Underlayment- PART 8 R0'OF REPLAC.EMENT BID:REPLACE 1500 SF OFf.ELT USING 15 ROLLS OF 30#FEC7'. <br /> 30#Single�Layer-Does not <br /> Include Removal or Dis osal <br /> Replace Ceiling Tiles- RART 5 OF 5:�CEILING TILE-0'NCE ALL DAMAGED TILES MAVE BEEN-REMOVED AND NO <br /> Stapled ADDITIONAL REPAIRS NEED MADE WILL THEN INSTALL ALL NEW 61 SQFT OF CEILING TILES <br /> 1N LIVING ROOM CEIL'ING IN' 1 6'X 6'AREA�AND: 1..5'X 5'AREA. <br /> Replace Asphalt Shingle& � . � PART 9 ROOF REPLACEMENT BID:RERLACE UP TO 160 SF OF SHEATHING USING'UP'f0(5), <br /> Sheathing-High Profile(40. �j 4'XS'-X1/2"'SHEETS OF PLYWOOD SHEA'iHING AS NEEDED AND 1500 SF OF'SHINGCES USING <br /> YR-Lifetime -Not Includin : / 45 BUNDLES OF ARCHITECTURAL SHINGCES. <br /> Rernove Sheathing/Deckiqg- • - PART_4 ROOF REPLACEMENT BID:REMO.VE U,P TO 160 SF'OF;SHEATHING AS NEEDED. <br /> 1/2in CDX"(Does Not.lnclude � " <br /> Haul Awa <br /> Remov�Roof Edge Metal- PART 6 ROOE REPLACEMENT BID: REMOVE 145 LF OF 3"DRIP EDGE. <br /> Galvanized.-3in:x 3in <br />
The URL can be used to link to this page
Your browser does not support the video tag.