Laserfiche WebLink
x:: ., <br /> , NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictions" <br /> which may be more resVictive than County regulations. The undersigned assumes responsibility for compliance with any <br /> applicable deed restrictions. <br /> UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or <br /> contractors to undertake work,they may be required to be licensed(n accordance with state and local regulations. If the <br /> contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation <br /> under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the <br /> intended work,they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847- <br /> 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign <br /> portions of the"contractor Block" of this application for which they will be responsible. If you, as the owner sign as the <br /> contractor,that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco <br /> County <br /> TRANSPORTATION IMPACTIUTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands <br /> that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings,change of <br /> use in existin� buildings, or expansion of existin�buildings, as specified in Pasco County Ordinance number 89-07 and <br /> 90-07, as amended. The undersigned also understands, that such fees, as may be due,will be identified at the time of <br /> permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to <br /> receiving a"certificate of occupancy"or final power release. If the project does not involve a certificate of occupancy or <br /> final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco Counry Water/Sewer Impact <br /> fees are due,they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances. <br /> CONSTRUCTION LIEN LAW(Chapter 713,Florida Statutes,as amended): If valuatien ef work is$2,500,00 or more,I <br /> certify that l, the applicant, have been provided with a copy ot the "Florida Construction Lien Law—Homeowner's <br /> Protection Guide"prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone <br /> other than the"owner",I certify that I have obtained a copy of the above described document and promise in good faith to <br /> deliver it to the"owner"prior to commencement. <br /> CONTRACTOR'S/OVYNEI�'3 AFFIDAVIT: I certify that ali the infDrmatiDn in this application is accurate and that all wDrk <br /> will be done in compliance with all applicable laws regulating construction,zoning and land development. Appiication is <br /> hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has <br /> commenced prior to issuance of a permit and that all work will be pertormed to meet standards of all laws regulating <br /> construction, County and Ciry codes, zoning regulations, and land development regulations in the jurisdiction. I also <br /> certify that I understand that the regulations of other government agencies may apply to the intended work, and that it is <br /> my responsibil'ity ta identify what actions I must take to be in comptiance. Such agencies include but are not fimited to: <br /> - Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive • <br /> Lands,Water/Wastewater Treatment. <br /> - Southwest Florida Water Management District-Welis, Cypress Bayheads, Wetland Areas, Altering <br /> Watercourses. <br /> - Army Corps of Engineers^�eawalls,Docks,Navigable Watenuays. <br /> - Department of Health 8� Rehabilitative ServiceslEnvironmental Health Unit-Wells, Wastewater Treatment, <br /> Septic Tanks. <br /> - US Environmental Protection Agency-Asbestos abatement. <br /> - Federal Aviation Authority-Runways. <br /> I understand that the following restrictions apply to the use of fill: <br /> - Use of fill is no�allowed in Flood zone bV"unless expressly permitted. <br /> - If the fill material is to be used in Flood Zone "A°, it is understood that a drainage plan addressing a <br /> "compensating volume"will be submitted at time of permitting which is prepared by a professional engineer <br /> licensed by the State of Florida. <br /> - If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall <br /> construction,I certify that fill will be used only to fill the area within the stem wall. <br /> - If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent <br /> properties. If use of fill is found to adversely affect adjacent properties,the owner may be cited for violating <br /> the conditions of the building permit issued under the attached permit application, for lots less than one (1) <br /> acre which are elevated by fill,an engineered drainage plan is required. <br /> If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in <br /> this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work, <br /> plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the application. A <br /> permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel,alter,or <br /> set aside any provisions of the technical codes,nor shall issuance of a permit prevent the Building Official from thereafter <br /> requirin�a correction of errors in plans,construction or violations of any codes. Every permit issued shall become invalid <br /> unless the work authorized by such permit is commenced within six months of permit issuance,or if work authorized by <br /> the permit is suspended or abandoned for a period of six(6)months after the time the work is commenced. An extension <br /> may be requested, in writing,from the Building Official for a period not to exceed ninety(90)days and will demonstrate <br /> justifiable cause for the extension. If work ceases for ninety(90)consecutive days,the job is considered abandoned. <br /> WARNING TO OWNER; YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR <br /> PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING,CONSULT <br /> WITH YOUR LENDER OR AN A'ITORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. <br /> FLORIDA JURAT(F.S.117.03) <br /> OWNER OR AGENT CONTRACTOR <br /> Subscntied and swo"'[o or a�mied tief6re riie tfiis Sutiscnted and sWorri fo 6r�-�rtned ti-o�e me tFiis <br /> ��h2�I lo b � C�1� 0'�/1��I I1� b �—�/i)C�U��1GL��i� <br /> Whb is are ts9naltylwe to me or has/have produced Who is/ar sonally k to me o has/have oroduced <br /> as identification. as identification. <br /> Notary Public ��� Notary Public <br /> Commission No. ` Commission No. <br /> "`°'••�•�"'��� AN.fONES <br /> ,b , t ,-�printed Name of Notary pe p�or���� <br /> :� �•: MY GOMM4���FF236487 4� <br /> '?i E X P l R E3 June 02.2019 :'� �,: MY COMMISSION p FF236487 <br /> „� �.,� .carr :'�j �CPIRES June 02.Z019 <br /> ��C1139�-0 53 .t�' <br /> . �,,,, � <br /> (AC71398-0'63 <br />