My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
16-17074
Zephyrhills
>
Building Department
>
Permits
>
2016
>
16-17074
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2017 10:06:19 AM
Creation date
2/20/2017 10:06:18 AM
Metadata
Fields
Template:
Building Department
Company Name
SILVERADO
Building Department - Doc Type
Permit
Permit #
16-17074
Building Department - Name
DUNE FL LAND I SUB LLC
Address
6270 SILVERADO RANCH BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� . <br /> http://ca.dep.state.fl.us/mapdirect/?focus=contamlocator.The ICR may be accessed at: <br /> http://www.dep.state.fl.us/waste/categories/brownfields/pages/ICR.htm,or <br /> http://ca.dep.state.fl.us/mapdirecd?focus=icr <br /> ❑ YES Continue to VI.C,below. <br /> ❑ NO Continue to Part VII. <br /> C. Has the site been remediated? <br /> ❑ YES Continue to Part VII. <br /> ❑ NO Continue to VI.D,below. <br /> D. Are the pollutants of concern(i.e.contamination)present in ground water at the dewatering project site at <br /> concentrations equal to or exceeding the surface water criteria in Rule 62-302.530? <br /> ❑ YES Dewatering activities do not qualify for coverage under this generic permit. However,the site may qualify for <br /> coverage under Rule 62-621.300(1),F.A.C.,or under an individual wastewater permit on the appropriate form listed in <br /> Rule 62-620.910,F.A.C. <br /> ❑NO Continue to Part VII. <br /> VII. DISCHARGE INFORMATION: <br /> A.MS4 Operator Name(if applicable): <br /> B.Receiving WaterName: HILLSBOROUGH RIVER <br /> V III.CERTI FICATI ON 1: <br />, I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in <br /> accordance with a system designed to assure that qualified personnel properly gather and evaluate the information <br /> submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for <br /> gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate and <br /> complete. I am aware that there are significant penalties for submitting false information,including the possibility of fine <br /> and imprisonment for knowing violations. <br /> If providing notice of commencement of construction as required by an Individual Environmental Resource Permit,I also <br /> certify that I am authorized by the Permittee(identified in Part III.A.,above),to commence construction activities <br /> authorized by the ERP Permit(identified in Part I.B.,above). <br /> Responsible Authority Name and Official Title(Type or Print): <br /> Brian Seeger,Senior Project Manager <br /> 3i'�a,y�i$pec�p,Y April 25,2016 <br /> Responsible Authority Signature: Date Signed: <br />� � Signatory requirements are contained in Rule 62-620.305,F.A.C. <br /> Page 3 of 6 <br /> DEP Form 62-621300(4)(b) <br /> Effective Date: 02/10/2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.