Laserfiche WebLink
� . � <br /> Items G.—J.: Provide the name,telephone and fax number(including area code)and E-mail address of the person <br /> authorized to submit this NOI on behalf of the operator(e.g.,Jane Smith,President of Smith Construction Company on <br /> behalf of the operator,Smith Construction Company;John Doe,Public Works Director on behalf of the operator,City of <br /> Townsville;etc.). This should be the same person as indicated in the certification in Part VI. <br /> Part IV—Project/Site Location Information: <br /> Items A.—E.: Enter the official or legal name and complete street address,including city,state and zip code of the project. <br /> Do not provide a P.O.Box number as the street address. If it lacks a street address,describe the project site location(e.g., <br /> intersection of State Road 1 and Smith Street). <br /> Item F.: Enter the county in which the project is located. <br /> Item G.: Enter the latitude and longitude,in degrees-minutes-seconds format,of the approximate center of the project. <br /> Item H.: Indicate whether the project is located on Indian Country Lands. If the project is located on Indian Lands you <br /> may not use this generic permit. Instead,you must apply to the http://cfpub.epa.gov/npdes/stormwater/const.cfin(EPA)for <br /> coverage. <br /> Item I.: Enter the appropriate five or six letter code from the list below to indicate the <br /> http://www.dep.state.fl.us/secretary/watman/default.htm in which your project is located: <br /> NWFWIVID=Northwest Florida Water Management District <br /> SRWMD = Suwannee River Water Management District <br /> SFWMD = South Florida Water Management District <br /> SWFWMD =Southwest Florida Water Management District <br /> SJRWMD =St.John's River Water Management District <br /> Items J.—M.: Enter the name,telephone and fax number(including area code)and E-mail address of the project contact <br /> person. The project contact is the person who is thoroughly familiar with the project,the facts reported in this NOI and <br /> who can be contacted by the Department if necessary. <br /> Item N.:Enter additional E-mail correspondence as needed to receive permit related documentation. (Optional) <br /> Part V—Project/Site Activity Information: <br /> Item A.:Check the appropriate box to indicate whether the project involves large construction activity or small construction <br /> activity. Check one box only. <br /> "Large Construction Activity"means construction activity resulting in the disturbance of five(5)or more acres of total land <br /> area. Large construction activity also includes the disturbance of less than five acres of total land area that is part of a <br /> larger common plan of development or sale such as a subdivision that will ultimately disturb five acres or more. <br /> "Small Construction Activity"means construction activity resulting in the disturbance of equal to or greater than one(1) <br /> acre and less than five(5)acres of total land area. Small construction activity also includes the disturbance of less than one <br /> acre of total land area that is part of a larger common plan of development or sale that will ultimately disturb equal to or <br /> greater than one acre and less than five acres. <br /> Item B.:Provide the approacimate total area of land disturbance,in acres,that the project will involve from commencement <br /> of construction through completion: <br /> Items C.-G.: Indicate the location where the Stormwater Pollution Prevention Plan(SWPPP)can be viewed. Provide the <br /> address where the SWPPP can be viewed if other than as provided in Parts II or III of the NOI. Note that to be eligible for <br /> coverage under the generic permit,the SWPPP must have been prepared prior to filing this NOI. <br /> Item H.: Enter the estimated construction start and completion dates in the MM/DD/YY format. <br /> Page 5 of 6 <br /> DEP Form 62-621300(4)(b) <br /> Effective Date: 02/10/2015 <br />