Laserfiche WebLink
Post Construction C303.3,C408.2.5.2 interior Lighting Fumished O&M instructions for systems and � � � <br /> equipment to th'e building owner or designated <br /> representative. <br /> Post Construction C408.3 interior Lighting Lighting systems have been tested to ensure � � � <br /> proper calibration,adjustment,programming,and <br /> operation. <br /> Post Construction C408.2.5.1 Mechanical Fumished HVAC as-built drawings submitted � � � <br /> within 90 days of system acceptance. <br /> Post Construction C303.3,C408.2.5.2 Mechanical Fumished O&M manuals for HVAC systems � � ❑ <br /> within 90 days of system acceptance. <br /> Post Construction C408.2.5.3 Mechanical An air and/or hydronic system balancing report is ❑ ❑ � <br /> provided for HVAC systems. <br /> Post Construction C408.2.1 Mechanical Commissioning plan developed by registered � � � <br /> design professional or approved agency. <br /> Post Construction C408.2.4 Mechanical Preliminary commissioning report completed and � � � <br /> certified by registered design professional or <br /> approved agency. <br /> Post ConsVuction C408.2.5.4 Mechanical Final commissioning report due to building owner � ❑ � <br /> within 90 days of receipt of certificate of <br /> occupancy. <br /> Post Construction C408.2.3.1 Mechanical HVAC equipment has been tested to ensure � � � <br /> proper operation. <br /> Post Construction C408.2.3.3 Mechanical Economizers have been tested to ensure proper � � � <br /> operation. <br /> EnergyGauge Summit0 Fla/Com-2014.TAM 2014-1.0 Compliant Software.Effective Date:June 30,2015 <br /> 2/25/2016 Page 13 of 13 <br />