My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
16-17113
Zephyrhills
>
Building Department
>
Permits
>
2016
>
16-17113
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2017 10:27:54 AM
Creation date
2/20/2017 10:27:51 AM
Metadata
Fields
Template:
Building Department
Company Name
FIRST PRESBYTERIAN CHURCH
Building Department - Doc Type
Permit
Permit #
16-17113
Building Department - Name
FIRST PRESBYTERIAN CHURCH
Address
5601 20TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> i <br />, , � �EPH��.H![��� F[�.� ���l��T��f�� <br /> 6907 Dairy Road, Zephyrhills, FL 33542 <br /> FIRE SERVICE USER FEES <br /> Occupancy Rlo.: <br /> Plan No.: Contractor: � <br /> Business Name: Billing Address: <br /> Business Address: <br /> Business Phone No.: Billing Phone No.: <br /> Business Fax No.: Billing Fax No.: <br /> Contact: Contact: <br /> PLAM REVIEW FEES INSPECTION FEES PERMIT FEE FALSE ALARM FEE I <br /> SitePlan N/C Annual N/C Sprinkler $50 1stAlarm N/C <br /> ulti-Family/Commercial .06 sf 1st Re-inspection N/C Standpipes $50 2nd Alarm N/C <br /> (Minimum Charge$25.00 2nd Re-inspection $100 Fire Pump $50 3rd Alarm N/C <br /> ❑ Plan Revisions DBL 3rd Re-inspectlon $250 Hoods $50 4th Alarm $100 <br /> 4th Re-Inspection $500 Fire Alarm $50 5th Alartn $150 <br /> SPRIMKLER SYSTEMS (Business closed until LP Gas $50 6th Alarm $200 <br /> B0-25 Heads $50 violations corrected) Natural Gas $50 NON COMPLIANCE $150 � <br /> 26 plus Heads $100 SPRINKLER SYSTEAAS Fuel Tanks- pertank $50 I <br />' STAMDPIPE SYSTEM Hydro Undergrounds $45 Sparklers $100 <br /> � Per Riser $50 Hydrostatic Test $65 per system Fire Works $500 <br /> FIRE PUII�P Acceptance Test $45 persystem Camp Fire $25 <br /> � Per Pump $100 Hydrant Flow $75 Controlled Bum $100 <br /> FIRE ALARM SYSTEM Hood/Duct $50 <br /> 8 0-25 Devices $50 FIRE ALARM SYSTEAA Place of Assembly $50 Mnual I <br /> 26 plus Devices $100 System Acceptance $50 Fire Protection $25 I <br /> SUPPRESSIOId SYSTEMS Recall Acceptance $50 Flammable Application $50 nnnua� <br /> Wet $50 OTHER Waste Tire Storage $50 Mnual <br /> Dry $50 Fire WaIl/Smoke Wall $15 perwail Generator<KW $100 <br /> CO2 $50 LP Gas $25 per tank Generator>30 KW 150 <br /> Other $50 Natural Gas $25 persyslem Bio-Hazard Waste $100 Mnual <br /> KITCHEN EXHAUST Fumigation Tenting $50 <br /> � Hood/Ducts $50 Tent 10'x10'or greater $15 per tent Torch PoUApplied $50 <br /> OTHER Fire Pump $45 Haz.IVlaterials $100 nnnuai <br /> LP Installation per tank $50 Fire Suppression $30 <br /> Fuel Tank Installation $50 System Acceptance <br /> (Per Tank) $50 Exhaust Hood/Duct $30 <br /> �Natural Gas Installation $50 Re-inspection DBL <br /> (Per System) (other than annual) <br /> �Spray Booth $50 � Inspection scheduled DBL � <br /> and cancelled less than <br /> 24 hours <br /> Construction Insp. N/C <br /> Emergency Vehicle A� $50 F/OLSE ALARM <br /> PLANS TOTAL�� � INSPECTION TOTAL� PERMIT TOTAL� TOTAL� <br /> GRAND TOTAL <br /> Comments: <br /> Date: P���/� <br />�� Inspector: l� <br /> nin <br /> I <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.