Laserfiche WebLink
� LB 1VI�s� <br /> ,4R.c+-t-tr�c-ru.R,E pEs i c,N <br /> March 30,2016 <br /> Mr. Kaivin Switzer <br /> Plans Examiner <br /> Building Deparment <br /> City of Zephyrhills, Florida <br /> 5335 8th Street <br /> Zephyrhilis, FL 33542 <br /> RE: Shell Buildout <br /> 5931 Gall Blvd <br /> Zephyrhills, FL 33542 <br /> Mr.Switzer, <br /> Thank you for your review of this project. We appreciate your time and attention. Enclosed are revised sheets pertaining � <br /> to your comment letter dated March 9, 2016,which is attached for reference,and the responses are noted below. I, <br /> Comment#1 Response: <br /> It is our understanding that Mr. Mark Trimble of Cox Fire Protection, Inc.has discussed this issue with you and it was <br /> decided that the inspection should take place after the fire protection systems have been refurbished to current <br /> standards. <br /> Comment#2 Response: <br /> Enclosed is new sheet LS-1, Life Safety Plan,dated March 30,2016,that covers the life-safety information you requested. <br /> Comment#3 Response: <br /> Enclosed is a statement dated March 29,2016,from Smiley Structural Engineering which states the structure and the roof <br /> loads,and confirms the structural integrity of the roof systems in supporting the new uses in conformance with the Florida <br /> Building Code. <br /> Please contact me if you have any other questions or comments. I appreciate your time, and look forward to your <br /> approval. <br /> Lee B. Manske,AIA, NCARB <br /> President <br /> L.B.Manske Architecture&Design,Inc. 2422 N.Rutgers Court,Wichita,KS 6�205 3i6•749•5873 <br />