My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
16-17159
Zephyrhills
>
Building Department
>
Permits
>
2016
>
16-17159
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2017 11:09:29 AM
Creation date
2/20/2017 11:09:28 AM
Metadata
Fields
Template:
Building Department
Company Name
WELLS FARGO BANK NA
Building Department - Doc Type
Permit
Permit #
16-17159
Building Department - Name
WELLS FARGO BANK NA
Address
38920 NORTH AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10ll r7ee: 1.2555.544.�464 (lillVli) VII1Ce: tS13.yLU:/663 (KVVl+') 1+'a%: 1:%L'/.ii56.35Ly <br /> ��� , ���� �� � � ������ <br /> � � ������ We say what we do and do what we say <br /> License#CBC 1330688 <br /> GAF Certified Master Elite Contractor <br /> GAF Low slope Master installer � <br /> Firestone Metal,Modified,and TPO roof Certified Contractor <br /> Johr�s li'panville Certified installer all single ply products ,, <br /> We maintain an"A"rating on Angie's Contractor Referral L'est <br /> Angie's List 2011,2012,and 2014 Super Service Award Winner <br /> Good standing with all State Licensing Boards <br /> Pro osal <br /> • Date:November 17, 2015 <br /> Client: DEP Management, LLC BidNumber: SRl�'11-8 <br /> Subject: reroof <br /> Building: 1 story <br /> Location: St Pete <br /> Proj ect: 3 8920 N avenue '� <br /> Zephyrhills, Florida 33542 # <br /> Attn: David Lamoureux / 727-470-5909 <br /> davidl@depmanagement.com � <br /> Our recommendations and Specifications are based on the information received from your <br /> Engineer/representative and/or our field representative.We will furnish on the above building <br /> all labor,tools,equipment, material,supervision,workers compensation,public liability <br /> insurance and property damage insurances necessary to complete in a thoroughly workman like <br /> manor all the work described below. <br /> _� <br /> Specification for new 50 year Dimensional roof system <br /> Project Preparation: <br /> . - .� <br /> Perform a pre job meeting to deteimine jobsite logistics and safety requirements. <br /> Furnish proposed construction schedule,if needed. <br /> Furnish and install temporary rooftop chute assembly for debris removal,if needed. <br /> Sa e : <br /> Furnish arid utilize all safety equipment in accordance with OSHA's written safety program. <br /> Furnish and install warning lines to identify azea's associated with ground related roofing activiries. <br /> Store all roofing materials in accordance with good roofing practice.Material placement will be distributed <br /> Throughout the entire roof area. <br /> , Page 1 of 4 <br /> Confidential <br />
The URL can be used to link to this page
Your browser does not support the video tag.