Laserfiche WebLink
� <br /> � <br /> Contract <br /> Project Name <br /> Page 5 of 5 <br /> Electrical(iTsinS Ezistin�Electric Service) <br /> . The Electrical Bid Furnished By The Electrical Contractor For This Project Will Include The <br /> Installation Of The Listed Outlets And Switches Only As Seen On The Owner/Contractor Signed <br /> Plans Or Drawings <br /> Additional Electrical Lightin�: <br /> Owner To Provide Light Fiztures <br /> Contractor To Install Owner ProvidQd Fiztures <br /> Insulation. Not Applicable Or Bid For This Project <br /> Interior Walls&Ceilin�Coverin�s <br /> The Contractor Will Furnish All Wall And Ceiling Covering As Listed <br /> '/Z" Drywall/Sheet Rock Will Be Installed,Taped And Finished By Contractor. <br /> Install 5quare Cornerbead On All Corners, <br /> Finish All Drywall And Sand All Work <br /> Texture New Ceilings And Walls To Match Existing As Closely As Possible. <br /> Trim Materials And Millwork: . Not Applicable Or Bid For This <br /> Painting• <br /> The Contractor Has Included In The Bid Price For All Caulking , Priffiing And 2 Coats Of Latex <br /> Paint In Following-Areas <br /> New Ceilings And Walls,,Casings And Exterior poor <br /> As well as newly installed egterior stucco <br /> Prime And Paint(2 Coats)Sherwin Williams Owner's Color Of Choice <br /> Cabinets"Bathroom Vanitv" . Not Applicable Or Bid For This Project <br /> Closet Shelving. Not Applicable Or Bid For This Project <br /> , Specialties. . Not Applicable Or Bid For This Project <br /> Floor Coverin�s: . Not Applicable Or Bid For This Project <br /> Carpet Not Applicable Or Bid For This Project <br /> Tile Not A.pplicable Or Bid For This Project <br /> Clean-Un&Duma Fees <br />, . The Contractor Will Clean-Up Alt Job Site Debris For The Demolition Or Construction Work <br /> Performed By Bianco Construction And Its Sub Contractors <br /> Allowances: Not Applicable Or Bid For This Project <br /> Aluminum <br /> 3"structural panel includes 6"beam in center of screen room attached to ezisting pool deck area <br /> Oational Costs: Not Applicable For This Project <br /> Total Labor and Materials Based $46,806.00 <br /> This price does not reflect any hidden structural defects,termite damage,wood rot,or other <br /> defective co�a►ponents of the ezisting house which may need to be repaired or replaced in order to <br /> properly complete the above-quoted work,and further acknowledge that the expense,if any,will <br /> be the responsibility of tlee property owner. <br /> I Peter Bianco Construction,Inc,The Contractor shall promptly pay all sums owed to laborers, <br /> subeontractors,and material-men who supply labor aud/or materials for the work and shall <br /> indemnify,hold harmless,�nd defend the owner and the property on which the work is located <br /> from mechanic's and material-men's liens. The contractor will furnish a final lien waiver within <br /> ten days after final payment received. <br /> RESPECTFULLY SUBMITTED <br /> Signature dba,Peter Bianco Construction,Inc. <br /> Date: <br /> ACCEPTANCE OF PROPOSAL AND CONTRACT <br /> THE ABOVE PRICES, SPECIFICATIONS,TERMS,AND CONDTTIONS ARE SATIFACTORY AND <br /> ARE HEREBY ACCEPTED. PETER BIANCO CONSTRUCTION,INC.IS HEREBY <br /> AUTRHORIZED TO PERFORM THE WORK AS SPECIFIED. PAYMENT SHALL BE MADE AS <br /> OUTLINED ABOVE. UWE FURTI�R ACKNOWLEDGE THAT WE HAVE RECEIVED AND <br /> REVIEWED TI�FOLLOWING NOTICES: <br /> BUYER'S RIGH�'T CAN OTICE TO THE OWNER/LIENS <br /> Accepte b . . � ` �� _ �� <br /> Owne i ature Date <br /> 5 Initialed by: Owner Contractor <br />