Laserfiche WebLink
- _ . i . <br /> Procedure for Lot Improvement Requests 06 � <br /> (Please refer to the "Rules and Regulations") Permit No t� /+�- <br /> I.Ai( requests are ta go ta the Chairrnan of the Lot Improvement Committee, You can hand deiiver it to the <br /> Chairman or place it in the EPPOA mail bax outside the EPPOA Office. The Chairman will present it to the Lot <br /> Impravement Cammitt�e far their review on a weekly basis. <br /> 2.Any request which is NOT filled ou#properly, whi�h includes, compte#e detailed/sicetch or pamphlet <br /> of Park Model to be purchased with pictures, to include footprint, setbacks, front elevation, back <br /> elevation, left&right eievation and must inciude atl sizes and locations af windows and doors,with <br /> length, width and heigh# of the overall structure including calor of siding, trim, shutters, daors and <br /> pavers, (if applicable}, will be returned#o the applicant without an action being taken. <br /> 3.The Cammittee wil! review al! requests and visit the site of the request as necessary. <br /> 4.After the Committee has recammended approval or denial of#he request, it wil! be presented #o the Board of <br /> Directors for their approval ar deniaE. The ftnal decision of the Board ta approve or deny the request must be <br /> made by at least three (3) directors, ane of which must be the Baard liaison of the Lot Improvement <br /> Committee, if available. <br /> S.There will be NO more ane day appeovals or last minute approvals. Request will take 7 to 14 days for <br /> appropriate review and cansideration, (if necessary� thus giving the Cammittee and Board members time to <br /> review and consider the requsst in a thorough rnanner. <br /> 6.The origina! request will be dated and signed as approved or denied, and after being copied the orfgina! will <br /> go into ta the members file and the capy returned to the Lot owner by the Board af Director liaison ar the <br /> Chairman of the committee. . , � <br /> 7.The cammittee will follow up an requests to determine that the request as presented and approved is b�ing <br /> adhered to. <br /> 8.Any permit will be ACGEP�ED FG?R APPROVAL between October'I5 an+d April 1 of each year, however, <br /> each owner must understand and know there must be enough members of#he Cammittee ta review <br /> and recommend to the Boa�d foc their appraval <br /> 9.Any changes made or� a previausly approved project must be resubmit#ed before beginning the <br /> changes. <br /> l0.tt is recamrnended that property owners of major improvernents or new construction projects request <br /> an appointment with the lat improvement comtmittee to review plans and answer any questions that tnay <br /> i <br /> artse. <br /> ! <br /> As the owner of Lot# / 1� , I understand th�: Lot Impravement Committee and/or the <br /> Board of Directors will enter the properky to follow the external progress of the construction or <br /> improvement. as submitted on the L.ot Improvement Request. , <br /> � % ' �!� �� �� �� �I <br /> � <br /> ,�iE.�`�"' � r <br /> A <br /> ot Owner's Signa re Date � <br /> � �`� �'.-�,��. �.�� l� �I5" <br /> �� <br /> � <br /> OF Iotimp-p.adt d1/24/2815 <br />