My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
15-16820
Zephyrhills
>
Building Department
>
Permits
>
2015
>
15-16820
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2017 10:55:36 AM
Creation date
2/22/2017 10:55:33 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
15-16820
Building Department - Name
CASELNOVA,MICHAEL & ANGELA
Address
7209 GREENSLOPE DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � <br /> % .� o� � <br /> � � � ' � <br /> �- �- �- � <br /> Professiottal Geological, Geophysical mzd Geotech�tical Engineering Ser��ices <br /> P.O.Box 14566 <br /> Gainesville,Florida 32604 <br /> Anfhony F. Itandazzo,Ph.D. David Bloomguist,PL.D. Attila A.Bodo,P.E. Dougtas L.Smith,Ph.D. ' <br /> Geologist Geotechnical Engineer Structuml Fxigineer Geophysicist i <br /> Florida PG*U003 Florida PEk 37235 Florida PEY 15834 Florida PGN OOl6 <br /> GeorgiaPGfll136 GeorgiaPG#I]40 <br /> PROPOSED REMEDIATION PROGRAM � <br /> Dr.Michael Caselnova's Office <br /> 7209 Green Slope Drive,Zephyrhills,Florida � <br /> State Farm.Florida Insurance Claim No. 59-D216-257-Geohazards,Inc.Project No. 2008674 � <br /> December 9,2008 <br /> Geohazards, Inc. has performed a geotechnical investigation at the above property. Based on <br /> the WOH�WOR/LOC zones identified in the SPT borings, sinlchole activity is considered to be <br /> a contributi.ng source of distress. Subsurface compaction grouting, a common ground <br /> modification technique, is indicated to mitigate raveling and fill void spaces adjacent to and i <br /> below the structure. <br /> The following is a basic plan, including estimated quantities, to remediate the sinkhole I <br /> conditions. � <br /> Task Description Estim Su Quantity i <br /> rv y <br /> 1 Mobilization/Demobilization 1 ea. � <br /> Pernuts � <br /> 2 Site Preparation 1 ea. <br /> � <br /> Injection Pipe Installation; I <br /> 36 total grout points, 2,3401f.total <br /> 3 South half of the Building-18 points, Soutlt ltalf of tlte building <br /> to competent Iimestone estimated 1,170 lf <br /> approximately 65 ft.below the surface � <br /> i <br /> 250-350 cy.total <br /> 4 Grout Injection ,S"outli half of tlze builcling � <br /> � 125-175 cy. � <br /> I <br /> 5 Monitoring/Certification 1 ea. <br /> � <br /> � <br /> (352)371-7243 (800)770-9990 Fax:(352)371-4410 � <br /> www.sinkholes.com adminCa,sinkholes.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.