Laserfiche WebLink
New SR WiteBrite Liquid A�Qlied Seamless Membrane <br /> Roofinq Svstem <br /> SCOPE OF WORK <br /> 1. Obtain all necessary permitting on the Owne�'s behaff <br /> 2. Install necessary safety equipment including waming lines 10' from the �oof edge. All <br /> employees working outslde of the waming lines will be tied off 100%of the time. <br /> 3. All workers onsite wiil be full time emp(oyees of Simon Raofing and have been E-Verified <br /> and drug tested. <br /> 4. Perform a pr�construction meeting witi� airport personnel to assure all safety <br /> precautions and plans are in agreement for a safe working environment that will not <br /> disturb the operations of the airport. <br /> 5. lnspect all fasteners throughout the entire roof and replace or tighten as needed. <br /> 6. Power-wash the entire roof to ensure a clean surFace for the WdeBrite membrane. <br /> 7. Prime the entire roof using SR WiteBrite Primer Plus with zinc to inhibit future rusting. <br /> 8. Encapsulate all fasteners, new and old to assure they are water tight and to prevent <br /> future rusting. <br /> 9. Seal the roof seams along the ridge cap using SR Wde&ite Cement <br /> 10. Install a layer of SR WiteBrite over the entire rooi area. <br /> 11. Install a second and final layer of SR WdeBrite over the entire roof area. <br /> 92. Provide the afrport with a 10 year labor and materials warranty to cover the <br /> entire system. The warranty will be 100% through Sfmon Roofing for the entirety of <br /> the teRn as we are both the manufacturer and installer of the SR Wite&ite system. <br /> s��►=or�ieooi��t�rwru�ne��r�►���w�c�o�e� <br />