My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
15-16866
Zephyrhills
>
Building Department
>
Permits
>
2015
>
15-16866
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2017 11:47:57 AM
Creation date
2/22/2017 11:47:55 AM
Metadata
Fields
Template:
Building Department
Company Name
GRAND HORIZONS
Building Department - Doc Type
Permit
Permit #
15-16866
Building Department - Name
KYPER,JAMES & SHERRI
Address
7902 KAY MARIE AVE LOT 309
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ���a��i� ' ��%� , <br /> � ������ ,n� <br /> ♦ <br /> Inst�lla#ion..lnstructions for.ModeI�LLBS lon�itudinat an� <br /> Lateral Br�cin ste�n Approved or F�4 i�da_. <br /> Revised: 43/15f15 <br /> Note: Yaur set must be designed by a Registered Professional Engineer if all ar one of the <br /> fallowing conditions occur: <br /> Location is within 1,500 feet of Coast Roof eaves exceeds 16" <br /> Pier Height exceeds 48" Main beam spacing exceeds 9.9.5" <br /> Side�vall height exceeds 108"' • <br /> (call Minute Man Productsa <br /> 1. Refer ta the Home Manufacturers Installation Instructions for pier locations. 6" Disc anchors <br /> 48" long with vertical ties are required at maximum 5'-4" center alang bo#h sidewalEs starting <br /> at maximum ofi 2'-0" in fram each end af the home, Vertical ties must be used at ail connec- <br /> tion points furnished by home manufacturer. Centerline anchors to be sized according to soil <br /> tarque candition.Any manufacturer's specifica#it�ns for sideuvali anchor loads in'e�cess af <br /> 4,000 ibs require a 5' anchor. • <br /> 2. Refer ta the Syst�m Placernent Plans for the location of �ongitudina3 Lateral Bracing System <br /> (See Attached). Each system is required to have a frame tie and stabilizer attached at each <br /> lateral arm stabilizing location. <br /> 3. Fiex Tube Instailation: <br /> A. Remave turf to expose firm leve! soi!at each SD3 pier pad locatian. Pre-assembls 1!2"x <br /> 1-114" carriage bolts onto the SD3 pad with bent edges of pad piaced dawnward, center <br /> pad under I-beam and firmly press 5D3 pad into soil and level. <br /> B. Attach Longitudina( and Lateral Flex Tubes at bolt iocations on pad (see detai( assembly <br /> dra�ving). Drive angle pins may be driven vertically through (4}slo#s in SD3 pier pad now <br /> or after home is totally set.Artgie Drive Pins may be driven up ta ten degrees off af vertical, <br /> 4. Standard Tube Installation: <br /> A. Far exiremely hard soil or surface conditions the SD3 pler pad can be placed fiat on <br /> surface with edges bent up. Mark (4) slot5 and pre-drill soil, rock ar asphalt with a 3/4" x <br /> 12" m8sonry drill bit. Drilling not required when installed on softer soils. <br /> B.Attach Longitudinal and Lateral Standard Tubes at Tube Clip locatians an pad(�ee detail <br /> assembly drawin�). Drive angfe pins may be driven vertically through {4}slots in SD3 pier <br /> pad now or after home is totaify set. Angle Orive Pins may be driven up to ten degrees off <br /> of vertical. <br /> 5. l.evel home an concrete blocks or ste�l piers by Minute Man. <br /> 6. lnstall Longitudinal And t.aferai Bracing in accordance with Systems Placement Plan anci <br /> Assembly Drawing. <br /> 7. lnstall verticai anch�rs, frame ties and stabilizers at each iatera!arm system lacafian. <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.