My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 GALL BLVD (5)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 GALL BLVD (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 8:00:07 AM
Creation date
3/23/2017 7:27:28 AM
Metadata
Fields
Template:
Building Plans
Street #
7050 GALL BLVD
Location
GALL BLVD
Description
2ND STORY ADDITION
Owner
EAST PASCO MEDICAL CENTER
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( I �, - . ' . _ �_'_ <br /> � =��'^ i <br /> ; <br /> �� � <br /> � <br /> i � <br /> G � Green Engineering Associates, Inc. <br /> � — Consulting Engineers — <br /> � I <br /> � 80n West Meridian Ave. � " <br /> � P.O. Box 1996, Dade City, Florida 34297-1996 <br /> � (904) 567-1958 • (904) 567-1959 <br /> i . i <br /> � October 28, 1988 <br /> � <br /> � <br /> . i <br /> . ! <br /> Mr. Bruce Bahr <br /> Building Department , <br /> City of Zephyrhills <br /> 503 Eighth Street <br /> Zephyrli i 11 s, FL 3�+24II <br /> Re: Fast Pasco Pledical Center � <br /> Emergency P,o�m Plus Addition/Parking <br /> Site Plan <br /> PN 88-30 <br /> , <br /> � ' Dear Bruce: <br /> i <br /> Enclosed are two (2) copies of the construction site plan (1 sheet) for the <br /> above 'referenced project. 111so enclosed is the copy of the Edge Group, P.A. <br /> architectural pjans which were previously submitted. <br /> I . <br /> � The following is in response to the 8 items of 10/21/88 site plan review cor�ments: <br /> i <br /> ll Site plan incorporates both project. <br /> 2�. Structure and relacations are shown. , <br /> 3� Designated heliport is not to be t:uilt. <br /> 4'. Existing FH' s are shown on plan. <br /> � 5�. Proposed £3" water main andone (1 ) additional hydrant has been included. <br /> , � The new hydrant is located with an open route some 450 feet from the <br />' j existing SW F.H. and some 410 feet from the existing SE F.H. <br /> 6�. SblF4!MD permit has been applied for and will be transmitted upon receipt. <br /> 7;. Parking spaces have been revised to conform to the City's requirements. <br /> 8'. Applicable codes - all construction shall conform to current codes as <br /> � adopted by the City. <br /> � <br /> I f the're are any quest i ons or add i t i ona 1 i nformat�i�o:� i s requ i red, pl ease adv i se. ' <br /> j Sincerely yours, <br /> ' GREEhI ENG I NEER I�!G ASSOC l ATES , I�JC. ; <br /> ��- ,�.a.� ' 'I <br /> I ' Rob rt F. Green E. <br /> President <br /> RFG:gg � <br /> . Enclosure <br /> cc: R. Dodd, EPMC/plan <br /> K. Griffin G <br /> - J. Rainwater, The Edge Group/plan . � <br /> � � Engineering - Land Planning - Field Inspections - Construction Management - Reports - Studies - <br /> I - -- - ------- --- <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.