My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 GALL BLVD (7)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 GALL BLVD (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:27:32 AM
Creation date
3/23/2017 8:51:04 AM
Metadata
Fields
Template:
Building Plans
Street #
7050 GALL BLVD
Location
GALL BLVD
Description
O.B. AND FUTURE CATH LAB ADDITION
Owner
EAST PASCO MEDICAL CENTER
Building Plans - Permit #
0373B
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> ; ; � <br /> . ; <br /> EAST `PASCO MEDICAL CENTER <br /> O.B. ; ADDITION/CON: EXEMPT <br /> CATH LAB ADDITION/NON-REVIEWABLE <br /> LOG NO. H-425-G <br /> NOVENIBER 7, 19 8 9 � <br /> i <br /> AC-5 Provide negative relative air pressure in Sterilizer <br /> 2309 . ' <br /> � <br /> AC-6� Each space used for administering inhalation <br /> ; anesthesia shall be provided with a scavenging system <br /> ` to vent waste gases . The system may be connected to <br /> the room exhaust system, but must be exhausted to the <br /> ` outside. Example: Delivery/Section 2308 . <br /> I <br /> AC-7� Verify that the film processor in the darkroom does <br /> not require an exhausz connection. <br /> i <br />� AC-8�� Vatiable air volume systems are not permitted in <br /> , recoveiy rooms, laboratories, delivery and birthing <br /> � tooms . The air handling unit schedule and <br />, � specification data, along with the control diagtam and <br /> � sequence of operation shown on Sheet M-6 , suggest the <br /> use of a variable air volume system. Revise the <br /> ; documents . <br /> f <br /> AC-9 Specifications, Section 15600 : Automatic temperature <br /> � control as indicated in the project manual index is <br /> , not evident within this submission. No response is <br /> required . <br /> P-1 , The clinical servic� sink to be relocated from the <br /> j fiist floor to Cleanup 2310 shall comply with all <br /> curtent requirements of Chapter lOD-28 , F.A.C. <br /> P-2 � Revise specifications to require compliance with the <br />' 1985 editions of NFPA-101, and the standard mechanical <br /> and plumbing codes . <br /> MFC�LJS/sl <br /> � <br /> FIRE PROTECTION <br /> FP-1� The hydraul_�c � calculations are the responsibility of <br /> the project engineer and said responsibility shall not <br /> be t=ansferred, or the option given, to the contractor <br /> as called for in the Specifications , Section 15800, <br />- 1.OSC. <br /> r <br />. Page 2 of 6 <br />. I <br />: I <br />
The URL can be used to link to this page
Your browser does not support the video tag.