My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6429 GALL BLVD (3)
Zephyrhills
>
Building Department
>
Building Plans
>
6429 GALL BLVD (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 10:24:16 AM
Creation date
4/11/2017 10:23:50 AM
Metadata
Fields
Template:
Building Plans
Street #
6429 GALL BLVD
Location
WALGREENS
Description
STORMWATER CALCULATIONS
Owner
WALGREENS DRUG STORE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> � <br /> � <br /> , <br /> SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT <br />, , � . - <br /> WATER QUALITY DESIGN <br /> � <br /> For thi� project, the Southwest Florida Water Management District requires the <br /> faccommodation of the first half inch of rainfall with recovery in less than or equal to 36 <br /> hours.; The following information shows that the proposed stormwater system detailed in <br /> � the site construction plans will comply with these requirements. <br /> � <br /> � ihe proposed stormwater facility will have a top of bank at elevation 91.5 feet with 4:1 <br /> side sli pes to the bottom of the facility at elevation 84.5 feet. The following calculations <br /> ` show that the half inch volume is stored in the proposed stormwater facility below an <br /> I <br /> elevation of 86.0 feet: <br /> ' Project Drainage Area = 140,992' sf <br /> I 140,992 sf x 0.5 inch x 12 inches = 5,875 cf <br /> ' '� foot <br /> St i rmwater Facility Area at 84.5 ft = 3,909 sf <br /> � Stormwater Facility Area at 86.0 ft = 5,563 sf <br /> Stormwater Facility Volume between EI. 84.5 and 86.0: <br /> � <br /> Volume = �3,909 sf + 5,563 sf1 x (86.0-84.5)= 7,104 cf <br /> ' 2 <br /> The half inch volume is recovered by percolation in less than 36 hours as can be seen in <br /> , � <br /> the m�I unding analysis in Appendix A. For example, the mounding analysis shows that <br /> after ine hour 22,139 cubic feet of runoff have been recovered by percolation, which is <br /> ' ' <br /> great i r than required15,875 cubic feet. The routing and mounding calculations were <br /> performed using the Basin Runoff Networking computer program developed by Mr. <br /> , James J. Boyd. (Hydrographs are included in Appendix B and the routing analysis is in <br /> i <br /> Appendix C). <br /> � <br /> i � <br /> , '�'The offsite drainage area's runoff will be conveyed via swales and/or on-site conveyance pipes to the <br /> existing FDOT basin/outfall (see Figure 3, Pre-Development Plan). <br /> I <br /> � CadM/tlata/99/6001-99/6001-99drainage <br /> � � <br /> i <br /> i I <br />
The URL can be used to link to this page
Your browser does not support the video tag.