My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 GALL BLVD (36)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 GALL BLVD (36)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 10:34:37 AM
Creation date
4/11/2017 10:31:18 AM
Metadata
Fields
Template:
Building Plans
Street #
7050 GALL BLVD
Location
GALL BLVD
Description
ANGIO/HUMAN RESOURCE RENOVATIONS
Owner
EAST PASCO MEDICAL CENTER
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> Add the following subparagraphs 3 . 4 . 3 , 3 . 4 . 4 , 3 . 4 . 4 . 1 and ' <br /> 3 . 4 . 4 . 2 . <br /> 3 . 4 . 3 Provide a list showing the name of the ' <br /> manufacturer proposed to be used for each of the <br /> products identified in the General Requirements of � <br /> the Specifications (Division 1) and, where <br /> applicable, the name of the installing <br /> Subcontractor. <br /> 3 . 4 . 4 The Architect will reply in writing to the , <br />, Contractor stating whether the Owner or the <br /> Architect, after due investigation, has reasonable ' <br /> objection to any such proposal . If adequate data <br /> on any proposed manufacturer or installer is not <br /> available, the Owner' s Representative may state <br /> that action will be deferred until the Contractor ' <br /> provides further data. Failure of the Owner to <br /> reply will constitute notice of no reasonable <br /> objection. Failure to object to a manufacturer ' <br /> will not constitute a waiver of any of the <br /> requirements of the Contract Documents, and all <br /> products furnished by the listed manufacturer must � <br /> comply with such requirements . <br /> 3 . 4 . 4 . 1 After the Contract has been executed, the Owner <br /> will consider a formal request for the � <br /> substitution of products in place of those <br /> specified only under the conditions set forth in <br /> the General Requirements of the Specifications , <br /> (Division 1) . <br /> 3 . 4 . 4 . 2 By making requests for substitutions based on ' <br /> subparagraph 3 . 4 . 4 . 1, the Contractor: <br /> a. Represents that he has personally investigated the <br /> proposed substitute product and determined that it , <br /> is equal or superior in all respects to that <br /> specified; <br /> b. Represents that he will provide the same warranty � <br /> for the substitution that the Contractor would for <br />, that specified; <br />, c . Certifies that the cost data presented is complete <br /> ' <br /> and includes all related costs under this Contract <br /> but excludes the Architect' s redesign costs, and , <br /> waives all claims for additional costs relate3 to <br /> the substitution which subsequently become <br /> apparent; and � <br /> d. Will coordinate the installation of the accepted <br /> substitute, making such changes as may be required <br /> for the work to be complete in all respects . , <br /> November 25 , 1998 00800-2 98088 . 00 , <br />
The URL can be used to link to this page
Your browser does not support the video tag.