My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 GALL BLVD (36)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 GALL BLVD (36)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 10:34:37 AM
Creation date
4/11/2017 10:31:18 AM
Metadata
Fields
Template:
Building Plans
Street #
7050 GALL BLVD
Location
GALL BLVD
Description
ANGIO/HUMAN RESOURCE RENOVATIONS
Owner
EAST PASCO MEDICAL CENTER
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> � 3 . Inspect deliveries and record shortages, and damaged or � <br /> defective items . <br /> 4 . Protect equipment from damage and from exposure to 1 <br /> elements . <br /> 5 . Handle products at site including uncrating, inventory ' <br /> and storage of equipment . <br /> 6 . Assemble, install, connect, adjust, and finish ' <br /> products . <br /> 7 . Provide installation inspections required by public ' <br /> authorities . <br /> 8 . Repair or replace items damaged by the Contractor or <br /> his operations . ' <br /> 1 . 04 FIXED EQUIPMENT LIST <br /> A. FIXED EQUIPMENT LIST includes items to be: '- <br /> 1 . Owner specified, Owner furnished and Contractor , <br /> installed. <br /> 2 . Owner specified, Owner furnished and Owner installed. <br /> 3 . Architect specified, Contractor furnished, and � <br /> Contractor installed. <br /> 1 . 05 WORK SEQUENCE r <br /> A. A scheduling sequence meeting should be held' with <br /> Administrator prior to any renovation work being done . ' <br /> Coordinate progress schedule with the Administrator and/or <br /> a delegated representative of the hospital staff . <br /> B. Construct work in stages to provide continuous public , <br /> usage. Do not close off public usage of facilities ��ntil <br /> use of one stage of work will provide alternate passage. � I <br /> 1 . 06 CONTRACTOR USE OF PREMISES <br /> A. Coordinate use of the premises under direction of � <br /> Architect or Hospital' s Representative . Contractor will <br /> submit plan or discuss locations on the site of storage <br /> areas, layout areas and offices to or with the Architect ' <br /> for approval . <br /> B. Do not unreasonably encumber site under this contract . ' <br /> C . Do not load structure with weight that will endanger <br /> structure . <br /> � <br /> November 25 , 1998 01010-2 98088 . 00 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.