My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 GALL BLVD (36)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 GALL BLVD (36)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 10:34:37 AM
Creation date
4/11/2017 10:31:18 AM
Metadata
Fields
Template:
Building Plans
Street #
7050 GALL BLVD
Location
GALL BLVD
Description
ANGIO/HUMAN RESOURCE RENOVATIONS
Owner
EAST PASCO MEDICAL CENTER
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� I <br /> i <br /> ' SECTION 01031 <br /> ' I ALTERATION PROJECT PROCEDURES <br /> PART 1 GENERAL <br /> � 1 . 01 SEQUENCE AND SCHEDULES <br /> ' A. Schedule work in the sequences and within times specified <br /> in Section 01010 . <br /> ' B. Submit separate detailed subschedule for alterations work, <br /> , coordinated with the Construction Schedules . Show: <br /> 1 . Each stage of work and dates of occupancy areas . <br /> ' 2 . Date of Substantial Completion for area of alterations <br /> � work, as appropriate. <br /> ' I <br /> ; 3 . Trades and subcontractors employed in each stage. <br /> � <br /> � i . 02 ALTER.ATIONS, CUTTING AND PROTECTION <br /> ' A. Assign the work of moving, removal, cutting and patching, <br /> � to trades qualified to perform the work in a manner to <br /> � ; i cause the least damage to each type of work, and provide i <br /> i <br /> means of returning surfaces to appearance of new work. <br /> ' B. Perform cutting and removal work to minimum necessary, and <br /> in a manner to avoid damage to adjacent work. <br /> 1 . Cut finish surfaces such as masonry, tile, plaster or <br /> ' metals by methods to terminate surfaces in a straight <br /> line at a natural point of division. <br /> ' , C. Perform cutting and patching as specified in Section <br /> 01045 . <br /> � D. Protect existing finishes, equipment and adjacent work, <br /> which is scheduled to remain, from damage. <br /> 1 . Protect existing and new work from weather and extremes <br /> ' of temperature. <br /> a. Maintain existing interior work above 60 degrees F . <br /> � � b. Provide weather protection, waterproofing, heat and <br /> � humidity control as needed to prevent damage to <br /> ' remaining existing work and to new work. <br /> ' i <br /> I <br /> ' iovelber 25 , 1998 01031-1 98088 . 00 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.