Laserfiche WebLink
' <br /> 1 . 05 COORDINATION OF SPACE ' <br /> A. Coordinate use of project space and sequence of ' <br /> installation of inechanical and electrical work which is <br /> indicated diagrammatically on the drawings . Follow <br /> routings indicated for pipes, ducts and conduits as <br /> closely as practicable, with due allowance for available � <br /> physical space; make runs parallel with lines of building. <br /> Utilize space efficiently to maximize accessibility for <br /> other installations, for maintenance, and for repairs . <br /> � <br /> B. In finished areas, except as otherwise indicated, conceal <br /> pipes, ducts and wiring in the construction. Coordinate <br /> locations of fixtures and outlets with finish elements . ' ', <br /> 1 . 06 COORDINATION OF CONTR.ACT CLOSEOUT <br /> A. Coordinate completion and cleanup of work of separate � <br /> Sections in preparation for Substantial Completion of <br /> portions of the work designated for Owner occupancy ' <br /> designated in Section 01010 . <br /> B . Coordinate completion and cleanup of work of separate <br /> Sections in preparation for Substantial Completion. ' <br /> C . After Owner occupancy of the premises, coordinate access <br /> to site by various sections for correction of defective ' <br /> work and work not in accordance with the Contract <br /> Documents, to minimize disruption of the Owner' s <br /> activities . ' <br /> D. Assemble and coordinate closeout submittals specified in <br /> Section 01700 . <br /> , <br /> PART 2 PRODUCTS <br /> Not Used. ' <br /> PART 3 EXECUTION ' <br /> Not Used <br /> ' <br /> END OF SECTION <br /> ' <br /> ' <br /> � <br /> November 25 , 1998 01040-2 98088 � 00 <br /> � <br />