Laserfiche WebLink
' I <br /> i <br /> rSECTION o 13 0 0 <br /> � i SUBMITTALS <br /> PART 1 GENER.AL <br /> ' 1 . 01 SUBMITTALS <br /> I <br /> � A. Submittals include shop drawings, design calculations, <br /> ' diagrams, illustrations, schedules, performance charts, <br /> nomenclature charts, brochures and other data which are <br /> prepared by the Contractor or any Subcontractor, <br /> ' i Manufacturer, Supplier, Fabricator, or Distributor and <br /> i which illustrate some portion of the project. <br /> ' B. The Contractor shall understand that the submittal of the <br /> required documents does not constitute compliance with the <br /> requirements of the contract documents; only drawings <br /> ' ; reviewed by the Architect/Structural Engineer constitute <br /> compliance. <br /> C. It is the Contractor' s responsibility to furnish <br /> ' equipment, materials, and labor for the project, which <br /> meets the requirements of the codes and authorities <br /> quoted, as well as the contract documents . Proprietary <br /> � '� ; items specified herein only establish a minimum functional <br /> and aesthetic standard and it is incumbent upon the <br /> Contractor to ascertain conformance of these proprietary <br /> ' items or any proposed substitution with the codes and <br /> � authorities . <br /> � <br /> � <br /> D. Contract documents shall not include shop drawings, vendor <br /> II ' drawings, or any material prepared and submitted by the <br /> contractor or subcontractor. <br /> 1I. 02 SUBMITTAL PROCEDURES <br /> ' A. The individual s ecifica ' <br /> p tion sections identify when <br /> submittals are required. <br /> ' B. Submit all requested items to the Architect for review. <br /> I <br /> , ' C . All submittals and samples shall be accompanied by <br /> transmittal letter, in duplicate, containing project name, <br /> Contractor' s name, number of drawings, titles, and other <br /> pertinent data. Identifv on transmittal work and product <br /> ' I by Specification Section. Transmittals which do not <br /> , identify the specification section number will not be <br /> processed by the Architect. <br /> ' � D. Provide required blank space on each submittal for the <br /> contractor' s and the Architect/Engineer' s stamps . <br /> � I I <br /> Noveiber 25 , 1998 01300-1 <br /> , 98088 . 00 <br /> � <br />