My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 GALL BLVD (36)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 GALL BLVD (36)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 10:34:37 AM
Creation date
4/11/2017 10:31:18 AM
Metadata
Fields
Template:
Building Plans
Street #
7050 GALL BLVD
Location
GALL BLVD
Description
ANGIO/HUMAN RESOURCE RENOVATIONS
Owner
EAST PASCO MEDICAL CENTER
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' � � " . , <br /> , B. Submit samples to illustrate functional characteristics of <br /> products, including parts and attachments as required by <br /> Architect/Engineer. <br /> i ' � <br /> C . Approved samples, which are of proper size, may be <br />� incorporated in work. <br />, ' D. Label each sample with identification. <br /> E. Field Finishes : Provide full samples at Project, at <br /> ' location acceptable to Architect as required by individual <br /> Specification Section. Install each sample complete and <br /> finished. Acceptable finishes in place may be retained in <br /> , completed work. <br /> 1 . 06 CONTR.ACTOR REVIEW <br /> ' A. Review submittals to determine and verify field <br /> I� measurements, field construction criteria, manufacturer' s <br /> catalog numbers, and compliance of submittal with <br /> , ' requirements of Contract Documents before transmittal to <br /> the Architect. <br /> ' B. Stamp and sign each sheet of shop drawings and product <br /> ; ', data, and sign or initial each sample to certify <br /> , compliance with requirements of Contract Documents . <br /> , , � Notify designated recipient in writing at time of <br /> submittal of deviations from requirements of Contract <br /> Documents . . <br /> ' C . Work requiring shop drawings, whether called for by the <br /> contract documents or requested by the Contractor, shall <br /> not be commenced until the submission has been reviewed by <br /> ' the Architect/Engineer. Work shall be in accordance with <br /> and performed from the reviewed drawings and the <br /> Contractor or his Subcontractor shall make certain that <br /> , i proper shop drawings are at the site of the work. <br /> D. By reviewing, approving and submitting shop drawings, the <br /> Contractor thereby represents that he has determined and <br /> , verified all field measurements, field construction <br /> criteria, materials, member sizes catalog numbers , and <br /> similar data and that he has checked and coordinated shop <br /> , � drawings with the requirements of the project and of the <br /> contract documents . <br /> ' 1 . 07 ARCHITECT/ENGINEER REVIEW <br /> I A.' The Architect/Engineer will review submittals with I <br /> reasonable promptness so as to cause no delay. The <br /> , Architect/Engineer' s review and/or corrections refer only <br /> to the general arrangement and conformance of the subject <br /> of the submittals with the design concept of the project <br /> ' i and with the information given in the contract documents . <br /> Under no conditions should the Contractor consider the <br /> i <br /> Noveiber 25 , 1998 01300-3 98088 . 00 <br /> � � <br /> � i <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.