My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 GALL BLVD (36)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 GALL BLVD (36)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 10:34:37 AM
Creation date
4/11/2017 10:31:18 AM
Metadata
Fields
Template:
Building Plans
Street #
7050 GALL BLVD
Location
GALL BLVD
Description
ANGIO/HUMAN RESOURCE RENOVATIONS
Owner
EAST PASCO MEDICAL CENTER
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> B. Substitutions will not be considered when indicated on � <br /> shop drawings or product data submittals without separate <br /> formal request, when requested directly by a subcontractor ' <br /> or supplier, or when acceptance will require substantial <br /> revision of Contract Documents . <br /> C . Do not order or install substitute products without � <br /> written acceptance. <br /> D. Only one request for substitution for each product will be , <br /> considered. When substitution is not accepted, provide <br /> specified product . <br /> 1 . 05 CONTRACTOR' S REPRESENTATION ' <br /> A. In making request for substitution, Contractor represents : <br /> 1 . He has personally investigated proposed product or ' <br /> method, and determined that it is equal or superior in <br /> all respects to that specified or the credit or , <br /> addition offered represents a fair or superior <br /> difference in value. <br /> 2 . He will provide the same warranty for substituted � <br /> product as for product or method specified. <br /> 3 . He will coordinate installation of accepted ' <br /> substitution into Work, making such changes° as may be <br /> required for Work to be complete in all respects . <br /> 4 . He waives all claims for additional costs related to � <br /> substitution which consequently become apparent . <br /> 5 . Cost data is complete and includes all related cost ' <br /> under his Contract, but excludes the Architect' s <br /> design. <br /> 1 . 06 REQUESTS FOR SUBSTITUTIONS , <br /> A. Submit a separate request for each product, supported with ' <br /> complete data, with drawings and samples as appropriate, <br /> including: - <br /> 1 . Comparison of the qualities of the proposed ' <br /> substitution with that specified. _ <br /> 2 . Changes required in other elements of the Work because 1 <br /> of the substitution. <br /> 3 . Effect on the construction schedule . ' <br /> 4 . Cost data comparing the proposed substitution with the <br />' product specified. <br /> ' <br /> November 25 , 1998 01630-2 98088 . 00 , <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.