Laserfiche WebLink
� <br /> PART 3 EXECUTION ' <br /> 3 . 01 DURING CONSTRUCTION ' <br /> A. Clean building and grounds and keep free from <br /> accumulations of waste materials and rubbish. <br /> B. At reasonable intervals during progress of work, but in no , <br /> case less than once a week, clean site and public <br /> properties and dispose of waste materials, debris and ' <br /> rubbish. <br /> C . Provide on-site containers for collection of waste <br /> materials, debris, and rubbish. Type of container _s at ' <br /> Contractor' s option. Containers with adequate capaci=y to <br /> accommodate anticipated needs . If containers do not have <br /> adequate capacity, increase intervals of waste removal ' <br /> until adequate capacity is provided. <br /> D. Vacuum interior building areas, where work is performed ' <br /> prior to painting and other finish work. Continue vacuum <br /> cleaning on an as-needed basis until building is read�r for <br /> occupancy. <br /> E. Minimize handling of materials . Do not drop or throw ' <br /> materials from heights . <br /> F. Schedule cleaning operations so that dust and other ' <br /> contaminants resulting from cleaning process will not fall <br /> on wet, new painted surfaces . ' <br /> 3 . 02 FINAL CLEANING <br /> A. Employ experienced workmen or professional cleaners for ' <br /> final cleaning. <br /> B. In preparation for substantial completion and occupancy, ' <br /> conduct inspection of sight-exposed interior and exterior <br /> surfaces, and of concealed open spaces . <br /> C . Remove grease, dust, dirt, stains, labels, fingerprints, , <br /> and other foreign materials from sight-exposed interior <br /> and exterior finished surfaces of this work. Poli�h so <br /> designated surfaces . Remove debris, rubbish, dirt, etc . , , <br /> from open concealed spaces, chases and above ceilings . <br /> D. Repair, patch, and touch-up marred surfaces to specified ' <br /> finish and to match adjacent surfaces . <br /> E. Broom clean paved surfaces; rake clean surfaces of <br /> grounds . ' <br /> F . Remove ice and snow from access to building. <br /> , <br /> November 25 , 1998 01710-2 98088 . 00 ' <br /> I <br />