Laserfiche WebLink
, <br /> 1 . Use separate colors for recording information about , <br /> each major system. <br /> 2 . Establish a code to denote the color for each trad� and / <br /> indicate by schedule placed on the front sheet o�: the <br /> Record Drawings . <br /> B . Marking Drawings : ' <br /> 1 . Keep markings current . ' <br /> 2 . Do not conceal work until required information has been <br /> recorded. <br />' 3 . Neatly and legibly mark Record Set to indicate a��tual ' <br /> construction, including: <br /> a. Depth of footings in relation to first floor level . ' <br /> b. Horizontal and vertical locations of underground <br /> utilities, valves, etc . referenced to building ' <br />� exterior lines . Show direction of flow of pipP and <br /> depth of piping underground. <br /> c . Field changes of dimensions and details . � <br /> d. Changes made by Contract Modifications . � <br /> ' <br /> e. Details not on original Contract Drawings . <br />' C . Marking Project Manual : ' <br />� 1 . Neatly and legibly mark Project Manual with black, <br /> permanent ink: ' <br /> a. On appropriate pages, record references to Addenda, <br /> Amendments, Modifications, Change Orders, and Field ' <br /> Orders . <br /> b. On appropriate pages, enter trade name, <br /> manufacturer, catalog number, and name of supplier ' <br /> of each product and item actually installecl, if <br /> different from that specified. <br /> c . Other items installed but not originally speci:Eied. ' <br /> D. Maintain documents listed in Paragraph 1 . 01A, above . ' <br /> 1 . 03 SUBMITTAL <br /> A. At Contract Closeout, deliver Record Documents to Owner' s ' <br /> Representative. <br /> , <br /> November 25 , 1998 01720-2 � 98088 . 00 ' <br />� _ <br />