My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 GALL BLVD (36)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 GALL BLVD (36)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 10:34:37 AM
Creation date
4/11/2017 10:31:18 AM
Metadata
Fields
Template:
Building Plans
Street #
7050 GALL BLVD
Location
GALL BLVD
Description
ANGIO/HUMAN RESOURCE RENOVATIONS
Owner
EAST PASCO MEDICAL CENTER
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,� <br /> ` 3 . 02 INSTALLATION: , <br /> A. Preparation: � <br /> 1 . On freshly finished concrete surfaces, no additional <br /> surface preparation will be required. � <br /> 2 . On areas where forms are recently removed, remove all � <br /> form oil and breaking compound residue to assure <br /> penetration of the product into the surface . � <br /> 3 . On existing concrete, vertical surfaces, and masonry <br /> surfaces : <br /> a. Sweep all areas to be treated, using a fine bristle ' <br /> broom, or hose off with water and let dry to remove <br /> all surface dust and dirt . � <br /> b. Free the surface from all contaminants which would <br /> inhibit penetration of the product into the pores � <br /> of the material to be treated. <br /> c . Remove all curing, sealing, and coating agents by <br /> use of chemical or mechanical means as required. � <br /> d. If acid is used to remove surface coatings, flush <br /> the surface with water sufficiently to remove all ' <br /> acid and acid residues . <br /> 4 . When applying near windows, mask the glass . � <br /> 5 . Avoid contact with plant life, glass, aluminum, and <br /> other finished surfaces . Where contact occurs, <br /> immediately wipe with a damp cloth or flush with water. � <br /> 6 . Avoid contact with asphaltic concrete. <br /> B. Application: ' <br /> 1 . On freshly finished surfaces, spray the product with a � <br /> low pressure sprayer immediately following the <br /> finishing operation. <br /> a. To assure proper curing, apply the product to the � <br /> entire surface as soon as the surface is firm <br /> enough to walk on, and before checking and <br /> temperature cracking begins . � <br /> b. Keep the entire surface wet for 30 minutes by <br /> spraying the dry spots immediately. <br /> � <br /> � <br /> November 25 , 1998 03375-2 98088 . 00 <br /> ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.