Laserfiche WebLink
� i <br /> � i <br /> f <br /> 1 �! <br /> SECTION 00800 - SUPPLEMENTARY CONDITIONS <br /> � 1I I . <br /> The following supplements modify, change, delete from or add to the General Conditions of the Contract <br /> ' for Coristruction, AIA Document A201, Fourteenth Edition, 1987. Where any article of the General ' <br /> Conditions is modified or any paragraph, or clause thereof is modified or deleted by these supplements, <br />, the unaltered provisions of that article,paragraph, subparagraph, or clause shall remain in effect. <br /> � <br />� PART 1 -GENERAL <br /> i <br /> � I <br /> 1.1 MODIFICATIONS OF GENERAL CONDITIONS <br />' � A. Article 1: General Provisions <br /> � Add the following subparagraphs 1.1.8 through 1.1.11: <br /> � � 1.1.8 The term "product" as used in the Drawings and Specifications mcludes <br /> materials, systems and equipment. <br /> � � 1.1.9 The term "or equal" as used in the Drawings and Specifications means "an equal <br /> i approved by the Architect." <br /> i <br /> � � 1.1.10 The term "provide" as used in the Drawings and Specifications means "furnish <br /> I and install." <br /> � � 1.1.11 Wherever technical standards, such as (but not limited to) ASTM, are referenced <br /> I <br /> I in the Proj ect Manual,it shall mean the standards current on the date the Contract <br /> iAgreement is finalized,unless otherwise noted. <br /> � B. Article 3: Contractor <br /> � i Add the following to subparagraph 3.2.1: <br /> � ' <br /> � 3.2.1.1 Revise as follows: It shall be the responsibility of the Contractor, prior to <br /> submittmg bids, to notify the Architect in writing of conflicting information in <br /> � � the drawings and specifications so an Addendum may be issued to all bidders. In <br /> ! the event of failure to submit such notice, the more expensive material or process <br /> I shall be included by the Contractor for a complete project. The Architect will <br /> � rule as to the material or process to be furnished. <br /> Add the following subparagraphs 3.4.3, 3.43.1, 3.4.4 and 3.4.4.1. <br /> 1 I <br /> 3.4.3 The Contractor shall be responsible to provide a list to the Owner showing the <br /> � name of the manufacturer proposed to be used for each of the products identified <br /> � I in the Drawings and Specifications and, where applicable, the name of the I <br /> ' installing Subcontractor. <br /> i <br /> � ' <br /> � March 3,2000 00800-1 99048.00 <br />