Laserfiche WebLink
' � � <br /> � I I <br /> SECTION 00800 <br /> ' I <br /> SUPPLEMENTARY CONDITIONS <br /> , , <br /> , The following supplements modify, change, delete from or add to <br /> the� General Conditions of the Contract for Construction, AIA <br /> Document A201, Fourteenth Edition, 1987 . Where any article of <br /> � the General Conditions is modified or any paragraph, or clause <br /> itheireof is modified or deleted by these supplements, the <br /> unaltered provisions of that article, paragraph, subparagraph, or <br /> , , clause shall remain in effect. <br /> i <br /> ; � <br /> � PART 1 GENERAT, <br /> 1 . 01 MODIFICATIONS OF GENER.AL CONDITIONS <br /> A. Article 1 : General Provisions <br />� � <br /> Add the following to subparagraph 1 . 1 . 8 : <br /> � <br /> , ; 1. 1 . 8 . 1 The term "product" as used in these Supplementary <br /> Conditions includes materials, systems and <br /> � � equipment. <br /> � , 1 . 1 . 8 .2 The term "or equal" as used in these Supplementary <br /> Conditions means "an equal approved by the <br /> ' �� , Architect" . <br /> I <br /> 1. 1 . 8 .3 The term "provide" as used in these Supplementary <br /> 1 Conditions means "furnish and install . " <br /> ' i <br /> 1. 1 . 8 . 4 Wherever technical standards, such as � (but not <br /> limited to) ASTM, are referenced in the Project <br /> I Manual, it shall mean the standards current on the <br /> ' date the Contract Agreement is finalized, unless <br /> , otherwise noted. <br /> 1 � . <br /> B. Article 3 : Gontractor <br /> ' � Add the following to subparagraph 3 .2 . 1 : <br /> � � 3 .2 . 1 . 1 Revise as follows : It shall be the responsibility <br /> � I of the Contractor, prior to submitting bids, to <br /> � I notify the Architect in writing of conflicting <br /> information in the plans and s�ecificati�ns s• an <br /> Addendum may be issued to all bidders . In the <br /> I � � event of failure to submit such notice, the more <br /> expensive material or process shall be included by <br /> the Contractor for a complete project. The <br /> 1 Architect will rule as to the material or process <br /> to be furnished. " <br /> ; I <br /> � January 22 , 1999 00800-1 98165 . 01 <br />