My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 GALL BLVD (38)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 GALL BLVD (38)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 10:46:50 AM
Creation date
4/11/2017 10:46:35 AM
Metadata
Fields
Template:
Building Plans
Street #
7050 GALL BLVD
Location
GALL BLVD
Description
RADIOLOGY AND ELEVATOR RENOVATION
Owner
EAST PASCO MEDICAL CENTER
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� I <br /> � , <br /> � � <br /> C. Article 4 : Administration of the Contract <br /> ' i i <br /> Add the following subparagraph: <br /> � 4 . 5 . 8 Any arbitration hearings necessary hereunder shall <br /> � � be conducted and held in Nashville, Tennessee. <br /> I D. Article 5 : Subcontractors <br /> I, ' Delete the last sentence from subparagraph 5 .2 . 1. Add the <br /> I I following subparagraph: <br /> i , <br /> ' 5 . 2 . 1. 1 No work shall be commenced until approval of such <br /> ; subcontractors has been given in writing by the <br /> Owner. If required, the Contractor shall furnish <br /> � I evidence satisfactory to the Owner, showing that <br /> any or all proposed subcontractors are competent <br /> ; to execute the various parts of the work covered <br /> � i by their subcontracts . <br /> i. Article 7 : Changes in the Work <br /> � Make the following changes to subparagraph 7 .3 . 6 : <br /> � In the first sentence, delete the words "a reasonable <br /> � allowance for overhead and profit" and substitute "an <br /> ; allowance for overhead and profit in accordance with the <br /> ' schedule set forth in subparagraph 7 .3 . 6 . 6 below. " <br /> ' ' i Add new subparagraph 7 .3 . 6 . 6 : <br /> � <br /> I ' The allowance for overhead and profit combined, included <br /> ' in the total cost to the Owner, shall be based on the <br /> following schedule: <br /> � ; 1. For General Contractor, 15� of the cost of the work <br /> � performed by own forces . <br /> ' 2 . For each subcontractor, 100 of cost of the work <br /> performed by own forces . <br /> � 3 . Markup for General Contractor, for work performed by <br /> � � , his 5ubcontractors, 5 percent of the amount due the <br /> � Sub-subcontractor. <br /> � � 4 . In order to facilitate checking of quotations for <br /> extras or credits, all proposals shall be accompanied <br /> ; by a complete itemization of costs including labor, <br /> � � materials, and Subcontracts . Labor and materials shall <br /> � be itemized in the manner prescribed above. Where <br /> � � major cost items are Subcontracts, they shall be <br /> , itemized also. <br /> � <br /> I <br /> � ' January 22, 1999 00800-3 � 98165 . 01 <br /> � <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.