Laserfiche WebLink
� <br /> ; <br /> i ' ' <br /> � <br />, � SECTION 01031 <br /> ; <br /> I ' ' � ALTER.ATION PROJECT PROCEDURES <br /> i <br /> ' PART 1 GENERAL <br /> � • 01 SEQUENCE AND SCHEDULES <br /> i � A. Schedule work in the sequences and within times specified <br /> ' � in Section 01010 . <br /> , I . <br /> B. Submit separate detailed subschedule for alterations work, <br /> � coordinated with the Construction Schedules . Show: <br /> ' � , 1. Each stage of work and dates of occupancy areas . <br /> � 2 . Date of Substantial Completion for area of alterations <br /> , work, as appropriate. <br /> I <br /> ' 3 . Trades and subcontractors employed in each stage. <br /> 1 . 02 ALTER.ATIONS, CUTTING AND PROTECTION <br /> i 1 i <br /> A. Assign the work of moving, removal, cutting and patching, <br /> I � to trades qualified to perform the work in a manner to <br /> � cause the least damage to each type of work, and provide <br /> means of returning surfaces to appearance of new work. <br /> ' '' B. Perform cutting and removal work to minimum necessary, and <br /> i in a manner to avoid damage to adjacent work. <br /> ' � 1 . Cut finish surfaces such as mason <br /> ; ry, tile, plaster or <br /> metals by methods to terminate surfaces in a straight <br /> � line at a naturaY point of division. <br /> ' � �C. Perform cutting and patching as specified in Section <br /> 01045 . <br /> � I <br /> ' , �D. Protect existing finishes, equipment and adjacent work, <br /> � � which is scheduled to remain, from damage. <br /> ' � 1 . Protect existing and new work from weather and extremes <br /> � of temperature. <br /> ' � a. Maintain existing interior work above 60 degrees F. <br /> � <br /> b. Provide weather protection, waterproofing, heat and <br /> ' � humidity control as needed to prevent damage to <br /> � remaining existing work and to new work. <br /> ' I <br /> � <br /> � � <br /> � I <br /> ' January 22 , 1999 01031-1 98165 . 01 <br /> i <br />