My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 GALL BLVD (38)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 GALL BLVD (38)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 10:46:50 AM
Creation date
4/11/2017 10:46:35 AM
Metadata
Fields
Template:
Building Plans
Street #
7050 GALL BLVD
Location
GALL BLVD
Description
RADIOLOGY AND ELEVATOR RENOVATION
Owner
EAST PASCO MEDICAL CENTER
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� I <br /> I <br /> ' II � <br /> 2 . 0�2 PRODUCTS FOR PATCHING, EXTENDING AND MATCHING <br /> , ' A. General requirements that work be complete: <br /> , 1 . Provide same products or types of construction as that <br /> ' ; in existing, structure, as needed to patch, extend or <br /> match existing work. <br /> , a. Generally, the Contract Documents will not define <br /> j standards of workmanship present in existing <br /> construction; the Contractor is expected to <br /> ' I ; determine products by inspection and any necessary <br /> I I testing, and wor]ananship by experience. <br /> i 2 . Presence of a product, finish or type of construction <br /> ' requires that patching, extending or matching be <br /> iperformed as necessary to make the work complete and <br /> consistent to identical standards of quality unless the <br />� , i existing standard of quality is less than desirable as <br /> determined by the Architect. <br /> ' 3 . Patch, replace and/or repair finishes disturbed in <br /> ' , areas where work is done under the terms of the <br /> contract but where no other finish work is required. <br /> ' PART 3 EXECUTION <br /> ' -3 . 01 PROCEDURES <br /> A. Patch and extend existing work using skilled mechanics who <br /> ' are capable of matching existing quality of wor]Qnanship. <br /> � Quality of patched or extended work is same as that for <br /> i <br /> new work. <br /> , 3 . 02 ADJUSTMENTS <br /> A. Tn�here partitions are removed, patch floors, walls and <br /> ' ceilings with finish materials to match existing and/or <br /> � replace both areas with new materials and finishes <br /> approved by Architect. <br /> ' II <br /> 1 . Where removal of partitions results in adjacent spaces <br /> ! becoming one, rework floors and ceilings to provide <br /> smooth planes without breaks, steps or bulkheads . <br /> , I <br /> I 2 . Where extreme change of plane (2" or more) occurs, <br /> request instructions from the Architect as to the <br /> ' I method of making transition. <br /> i <br /> I IB. Trim and refinish existing doors as necessary to clear new <br /> , floors . <br /> ' � January 22 , 1999 01031-3 98165 . 01 <br /> I <br /> � I <br />
The URL can be used to link to this page
Your browser does not support the video tag.