My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 GALL BLVD (38)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 GALL BLVD (38)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 10:46:50 AM
Creation date
4/11/2017 10:46:35 AM
Metadata
Fields
Template:
Building Plans
Street #
7050 GALL BLVD
Location
GALL BLVD
Description
RADIOLOGY AND ELEVATOR RENOVATION
Owner
EAST PASCO MEDICAL CENTER
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ' <br /> ' <br /> 1 . 05 COORDINATION OF SPACE <br /> A. Coordinate use of project space and sequence of , <br /> installation of inechanical and electrical work which is <br /> indicated diagrammatically on the drawings . �ollow <br /> routings indicated for pipes, ducts and condui�s as ' <br /> closely as practicable, with due allowance for available <br /> physical space; make runs parallel with lines of building. <br /> Utilize space efficiently to maximize accessibility for ' <br /> other installations, for maintenance, and for repairs . <br /> B. In finished areas, except as otherwise indicated, conceal <br /> pipes, ducts and wiring in the construction. Coordinate ' <br /> locations of fixtures and outlets with finish elements . <br /> 1 . 06 COORDINATION OF CONTRACT CLOSEOUT , <br /> A. Coordinate completion and cleanup of work of separate <br /> Sections in preparation for Substantial Completion of ' <br /> portions of the work designated for Owner occupancy <br /> designated in Section 01010 . <br /> B. Coordinate completion and cleanup of work of separate ' <br /> Sections in preparation for Substantial Completion. <br /> C. After Owner occupancy of the premises, coordinate access ' <br /> to site by various sections for correction of defective <br /> work and work not in accordance with the Contract <br /> -; Documents, to minimize disruption of the Owner' s ' <br /> activities . <br /> D. Assemble and coordinate closeout submittals specified in <br /> Section 01700 . ' <br /> PART 2 PRODUCTS , <br /> Not Used. <br /> PART 3 EXECUTION ' <br /> Not Used � <br /> END OF SECTION � <br /> ' <br /> ' <br /> January 22 , 1999 01040-2 98165 . 01 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.