My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 GALL BLVD (38)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 GALL BLVD (38)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 10:46:50 AM
Creation date
4/11/2017 10:46:35 AM
Metadata
Fields
Template:
Building Plans
Street #
7050 GALL BLVD
Location
GALL BLVD
Description
RADIOLOGY AND ELEVATOR RENOVATION
Owner
EAST PASCO MEDICAL CENTER
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i � <br /> � <br /> � � � <br /> i SECTION 01300 <br /> , <br />� � ' SUBMITTALS <br />, � PART 1 GENERAT, <br /> I <br /> ; 1 . Oi1 SUBMITTALS <br /> � � A. Submittals include shop drawings, design calculations, <br /> ; j diagrams, illustrations, schedules, performance charts, <br /> � nomenclature charts, brochures and other data which are <br /> � prepared by the Contractor or any Subcontractor, <br /> ! Manufacturer, Supplier, Fabricator, or Distributor and <br /> � i which illustrate some portion of the project. <br /> ; B. The Contractor shall understand that the submittal of the <br /> required documents does not constitute compliance with the <br /> � I - requirements of the contract documents; only drawings <br /> reviewed by the Architect/Structural Engineer constitute <br /> ; compliance. <br /> � C. It is the Contractor' s responsibility to furnish <br />� I equipment, materials, and labor for the project, which <br /> � � meets the requirements of the codes and authorities <br /> quoted, as well as the contract documents . Proprietary <br /> ' ' items specified herein only establish a minimum functional <br /> ; � and aesthetic standard and it is incumbent upon the <br /> � �_� I Contractor to ascertain conformance of these proprietary <br /> items or any proposed substitution with the codes and <br /> , � authorities . <br /> � �D. Contract documents shall not include shop drawings, vendor <br /> ! drawings, or any material prepared and submitted by the <br /> � , I contractor or subcontractor. <br /> 1 . 02 SUBMITTAL PROCEDURES <br /> I <br /> ,' A. The individual specification sections identify when <br /> i <br /> submittals are required. <br /> ; iB. Submit all requested items to the Architect for review. <br /> � � � <br /> � ,C . Al1 submittals and samples shall be accompanied by <br /> � transmittal letter, in duplicate, containing project name, <br /> � i Contractor's name, number of drawings, titles, and other <br /> � pertinent data. Identifv on transmittal work and product <br /> � by Specification Section. Transmittals which do not <br /> � i identify the specification section number will not be <br /> processed by the Architect. <br /> � I <br /> � i D. Provide required blank space on each submittal for the <br /> I contractor's and the Architect/Engineer' s stamps . <br />� � � <br /> i � � January 22, 1999 01300-1 98165 . 01 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.