My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 GALL BLVD (38)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 GALL BLVD (38)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 10:46:50 AM
Creation date
4/11/2017 10:46:35 AM
Metadata
Fields
Template:
Building Plans
Street #
7050 GALL BLVD
Location
GALL BLVD
Description
RADIOLOGY AND ELEVATOR RENOVATION
Owner
EAST PASCO MEDICAL CENTER
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i � � � <br /> ( <br /> � I I <br /> I ( <br /> B. Submit samples to illustrate functional characteristics of <br /> � j i products, including parts and attachments as required by <br /> Architect/Engineer. <br /> i � <br /> � � C. Approved samples, which are of proper size, may be <br /> I I incorporated in work. <br /> � D. Label each sample with identification. <br /> ' � , <br /> I E. Field Finishes : Provide full samples at Project, at <br /> � location acceptable to Architect as required by individual <br /> � Specification Section. Install each sample complete and <br /> ifinished. Acceptable finishes in place may be retained in <br /> � , completed work. <br /> � I 1 . OI6 CONTRACTOR REVIEW <br /> � <br /> ' A. Review submittals to determine and verify field <br /> � I measurements; field construction criteria, manufacturer's <br /> catalog numbers, and compliance of submittal witlz <br /> - i requirements of Contract Documen�s before transmittal to <br /> ' � the Architect . <br /> � � <br /> B. Stamp and sign each sheet of shop drawings and product <br /> ' � data, and sign or initial each sample to certify <br /> I compliance with requirements of Contract Documents. <br /> � � Notify designated recipient in writing at time of <br /> � ' submittal of deviations from requirements of Contract <br /> � ��._� Documents . <br /> � C. Work requiring shop drawings, whether called for by the <br /> ; contract documents or requested by the Contractor, shall <br /> not be commenced until the submission has been reviewed by <br /> , �I the Architect/Engineer. Work shall be in accordance with <br /> ' , and performed from the reviewed drawings and the <br /> � � I Contractor or his Subcontractor shall make certain that <br /> proper shop drawings are at the site of the work. <br /> � � <br /> � f �D. By reviewing, approving and submitting shop drawings, the <br /> i Contractor thereby represents that he has determined and <br /> ' verified all field measurements, field construction <br /> � ! I criteria, materials, member sizes catalog numbers, and <br /> similar data and that he has checked and coordinated shop <br /> � drawings with the requirements of the project and of the <br /> contract documents . <br /> � 1 . 07 ARCHITECT/ENGINEER REVIEW <br /> � <br /> � ' �A. The Architect/Engineer will review submittals with <br /> � � reasonable promptness so as to cause no delay. The <br /> � Architect/Engineer' s review and/or corrections refer only <br /> � ' , to the general arrangement and conformance of the subject <br /> , of the submittals with the design concept of the project <br /> ' and with the information given in the contract documents . <br /> j � Under no conditions should the Contractor consider the <br /> � � January 22, 1999 01300-3 98165 . 01 <br /> I � <br />
The URL can be used to link to this page
Your browser does not support the video tag.