Laserfiche WebLink
.. ,. , � <br /> .�, ; � � - <br /> �� ; <br /> EAST PA5C0 MEDICAL CENTER <br /> , REGISTRATION/SURGERY EXPANSION%SAME DAY SURGERY � <br /> � LOG NUMBER H-425-E ' i <br /> � � <br /> ARCHITECTURAL � <br /> , <br /> � Sheet A-6 : � �� , <br /> i <br /> iA-1 Provide additional !fire extinguishers in recessed <br /> � cabinets so located �in the corridors ! that the travel <br /> distance from any point in a room to an extinguisher � <br /> ' does not exceed 75 feet . � <br /> Sheet A-9 : ; <br /> � A-2 Change the general nolte concerning blow-out patches to <br />� include buttering the back side with joint compound <br /> ; for aZ1 blow-out patches . ; � <br /> I� � <br /> Specifications : I <br /> A-3 Show that all interior finishes sha11 comply with 1985 <br /> NFPA 101 12-3 . 3 . i � <br /> i � <br /> �� <br /> ,MFC:MLV/by � <br /> � <br /> � <br /> �MECHANICAL � <br /> � <br /> �AC-1 Maintain a minimum of 6 " clearance between the smoke <br /> wall and the new exhaust duct to permit the inspection <br /> of the smoke wall . <br /> i � <br /> AC-2 The new fire/smoke damper shown for o le of the su�pply <br /> ; registers in O.R. No . 3 is not requi,red and may be � <br /> ! removed if desired . � i ' ' <br /> �AC-3 Design Scrub 246-A � and Vestibule 231 for equal <br /> � relative air pressure . Show the des;ign C.F.M. and <br /> , airflow direction of �air transferred through undercut <br /> doors . Limit the und'ercut air quantity to a maximum <br /> I of 125 C .F.M. <br /> AC-4 Please show the ar�chitectural background on the <br /> � mechanical and plumbin�g plans (Volume 1) . � , <br /> , I i <br /> AC-5 Verify that the supp�ly and exhaust air systems , run , <br /> continuously and shut down on fire alarm dictation. ; <br /> , I <br /> � ' <br /> , ! <br /> I <br /> � i j <br /> � i i <br />� i <br /> � <br /> � <br /> � � � _ <br /> i ' <br />