Laserfiche WebLink
� � - — I - - -- - ---- � <br /> (� , � <br /> 'r' � ' � <br /> : , <br /> ;Sheet E-� —Power and Systezns First Floor Plan: � <br /> '� 1. Revise power and systems layout in 1-110, 1-111, 1-121, 1-121A, 1�124, I-125, 1-12 , 1-126A, and <br /> � 1-127 to reflect new floor plan as shawn an Sheet E-4, Delta 2, dated June 30,20Q0. <br /> � <br /> � I <br /> ,Sheet E-6---Electrical Qne Line Diagram and Schedules: <br /> 1. Revise panel schedules 1 LN6 and 1 LC7 as shawz� Sheet E-4�, De1ta 2, dated June 30, 000. <br /> , i <br /> i Sheet P-2—First F1oor Plan-Demolitian—Plumbzng: � <br /> � <br /> i 1. Nlodify the extent of demolition of hot water line and hot return line'as shown within Iauded area <br /> ! located an sheet F-2, labeled Delta No. 2, dated June 30, 2000. � <br /> i <br /> � <br /> {Sheet P-3 —First Floor 1'lan—Plumbing: <br /> ( <br /> ;1. Modify location and routing of waste, water, and vent pipe serving Toilet 1-126A as hown within <br /> ; clauded area Iocated on P-3, labeled Deita No. 2, dated June 30, 200�0. <br /> , ! <br /> �2. Madify location and routing af waste,water, and vent pipe servzng VWomen's Toilet 1-130 as shown <br /> i within clauded area located an P-3, labeled Delta No. 2, dated June 3�0, 24QQ. <br /> I <br /> ;Sheet FP-1 —First F1aor Plan—Fire Protection: <br /> � � � <br /> !1. Modify locatian of sprinkler heads to fit with new partition layout as shown within clo ded area <br /> ; located an sheet FP-1, labeled Delta No. 2, dated June 30, 2000. ! <br /> � � . <br /> ' , , <br /> I ' <br /> i <br /> i <br /> I <br /> , � <br /> { : <br /> ( - � <br /> � � <br /> i � � '� <br /> i � <br /> � � � <br /> ; <br /> � <br /> , , <br /> � � <br /> � ; � <br /> i � <br /> � ; : <br /> � <br /> � , <br /> � <br /> Revisian No.2 Page-2 Phoenix Design Grou�,I�c. ; <br /> •I � �� I 104 Woodmont Blvd•Suite 218�,Nashville,TN 37205•(615)386-92$7 I <br /> i � � <br /> I I � <br /> � � <br /> —-- ----------- — -- � I � <br />