Laserfiche WebLink
' i � � <br /> , <br /> : � <br /> ; � .? � � � <br /> � � <br /> ; ; , <br /> , <br /> Sheet A-6—Noted and Dimensioned—First Floor Plan: i �� <br /> i I1� �Incorporate the changes to the scope of work now indicated as "Add Alternate No. 1" as <br /> �indicated in the attached drawing A-5, d Ited Apri120, 2000, Delta No. 1. � �, <br /> . 2. 'Incorporate the name change of Room 1-120 from "Kitchen" to "Lounge" as indicat�l d in ' <br /> the attached drawing A-6, dated Apri120�, 2000, Delta No. 1. �� <br /> 3. -Incorporate the changes to Files 1-110, HC Toilet 1-126A, VP 1-124, DON 1-127, C�FO <br /> ;1-125, and the removal of Conference Room 1-112 from the scope of work as indicated <br /> in the attached drawing A-6, dated April �20, 2000, Delta No. 1. i I <br /> I � i � <br /> S�eet A-10—Reflected Ceiling—First Floor Plan: <br /> , , , <br /> � <br /> 1. Incorporate the changes to the scope of work now indicated as "Add Alternate No. 1'i' as <br /> indicated in the attached drawing A-10, dated Apri120, 2000, Delta No. 1. '� <br /> 2. Incorporate the changes to the Reflected Ceiling Plan as indicated in sheet A-10, dated � <br /> Apri120, 2000, Delta No. 1. +� � � <br /> � � <br /> � ; <br /> Sheet A-11 —Casework Elevations and Details: I � � <br /> � <br /> ! � � <br /> 1, Incorporate the change of room name in casework elevation 3 and 4 from "Kitchen" to � <br /> �`Lounge" as indicated in sheet A-11, dated Apri120, 2000, Delta NI. 1. i I <br /> i <br /> Sheet A-12—Elevations and Sections: I i I <br /> 1. Incorporate the changes to Detail No. 5 "Enlarged H.C.Toilets" as indicated in sheet A-12, dated i <br /> Apri120, 2000, Delta No. 1. � <br /> � <br /> � ; I , <br /> Sheet A'-13 —Elevations and Sections: � <br /> � <br /> , <br /> 1. Incorporate the removal of Details 03 and 08 from the scope of work as indicated in sheet i <br /> A-13, dated A,pri120, 2000,Delta No. 1. i � ' <br /> 2. Incorporatethe changes to Details, 02, 0 , and 07 for expansion of j`Panzer" mesh sy'stem � <br /> as indicated in sheet A-13, dated Apri120, 2000, Delta No. l. ' � ' <br /> I I <br /> � <br /> � <br /> Sheet A=14—Door Schedule and Details: I , � <br /> , <br /> 1. Incorporate the changes to Details A and B now indicated.as "Add Alternate No. 1" as <br /> � <br /> i�ndicated in sheet A-14, dated Apri120, 2000,Delta No. 1. i ; '� <br /> 2. Incorporate the changes to Dimensions in the Detail A as indicated in the attached ; � ' <br /> drawing A-14, dated Apri120, 2000, Delta No. 1. ' , <br /> 3. Incorporate the changes to the Door Schedule as indicated in the attached drawing A�14, <br /> dated Apri120, 2000, Delta No. 1. � ' � <br /> i <br /> I I � � <br /> Sheet F�;1 —Finish Plan: � � ' <br /> , <br /> ' � � i <br /> 1.I Incorporate the changes as indicated in the enclosed drawing F-1, dated Apri120, 2000, <br /> Delta No. 1. � � ' <br /> � li �' � <br /> , � <br /> , i ' <br /> RI�VISION NO. 1 PAGE 2 ', JOB NO. 99048.00 , � <br /> � � I <br /> � i � <br /> � � , � <br />