My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 GALL BLVD (46)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 GALL BLVD (46)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2017 1:25:42 PM
Creation date
4/12/2017 1:20:01 PM
Metadata
Fields
Template:
Building Plans
Street #
7050 GALL BLVD
Location
GALL BLVD
Description
DIETARY EXPANSION
Owner
EAST PASCO MEDICAL CENTER
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.�'�� , ' i <br /> � <br /> :� _ � � I; <br /> � I <br /> - , ` <br /> � I <br /> SIUTTON ENGINEERING SERVICES INC I <br /> 1797 SANTA BARBARA DRNE PHONE : 813-733-9546 <br /> DUNEDIN, FL 34698 � FAX : 813-733-9546 I <br /> I I <br /> � I <br /> �esponse to AHCA comments ,6-6-96: ', <br /> I � I <br /> East Pasco Medical Center � ''' <br /> % <br /> Dietary Expansion/Courtyard (Kitchen Trayline Modified) , <br /> Log No. H-425-W/CON No. Exempt#9600018 �� <br /> Original comments dated 6-6-96 �' <br /> � <br /> MECHAI�iICAL: '; <br /> � <br /> Comment No. AC-1 <br /> �� Provide differential pressure gauges across the filter media of AHU-1. � <br /> �� ; � <br /> ; , , <br /> ' Response: � <br /> , , � <br /> '� The differential pressure gauges will be added,as requested. A change�order to the contract <br /> �� will direct the contractor to provide these items. <br /> I � <br /> Commerit No. AC-2 <br /> �i� The test and balance report and differential pressure test across duct smoke detector tubes has <br /> to be reviewed and accepted by the engineer of record for the final AHCA survey. <br /> � � � <br /> � Response: <br /> � , <br /> A statement will be added to the contract documents directing the contractor to provide the <br /> ' test and balance report and the duct smoke detector tube test repvrt to the engineer for review <br /> and acceptance. A change order to the contract will direct the contractor to provide these <br /> , items. '� ! <br /> � � I <br /> � �� � �� , - <br /> FIRE PROTECTION: <br /> � � <br /> Comment No. FP-1 <br /> Provide inspection test station for the remote design area sprinkler system.� <br /> I <br /> Response: I <br /> � i <br /> � An inspector's test connection will be added for the remote design area, as requested. A <br /> cha'nge order to the contract will direct the contractor to provide this item. � <br /> � <br /> I, I <br /> � �i ' <br /> � <br /> � _ ;� -._ -_ <br /> � .. = ,.:... � - - <br />
The URL can be used to link to this page
Your browser does not support the video tag.