Laserfiche WebLink
. � . ---- -.. <br /> r <br /> S]ECT�ON 15375 <br /> S'Y'AND1'IPE AND kIOS� SYSTEiYi <br /> I'f\RT 1 - GE�NElZ�L <br /> � <br /> 1.U1 REL�aTED DOCUl�1ENTS <br /> ` Dra�vings and general provisions of the Contract, including General and Supplementary <br /> Conditions and Division 1 Specification Sections, apply to this Section. <br /> 1.02 SECTION INCLUDES <br /> A. Standpipe system. <br /> 1.03 RELATED SECTIONS <br /> A. Sec�on 15325 - Sprinkler Systems. <br /> 1.04 REFERENCES <br /> A. NFPA 14 - Installation of Standpipe and Hose Systems. <br /> B. UL -Fire Protection Equipment Directory. <br /> 1.05 SUBlYIITTALS FOR REVIEW <br /> A. Product Data.: Provide manufacturer's catalog sheet for equipment indicating rough-in size, <br /> finish, and accessories. <br /> B. Shop Drawings: Indicate supports,.components, accessories, and sizes. <br /> � <br /> 1.06 SUBMITTALS AT PROJECT CLOSEOUT <br /> A. Projact Record Documents: Record actual locations of components. <br /> B. Ope ation Data: Include manufacturer's data. <br /> •� , <br /> C. Maintenance Data: Include servicing requirements and test schedule. <br /> - D. CerGi icates:The installing Contractor shall complete and sign the apropiate material and <br /> test�oertificates per NFPA 13 Sec 8-2. Provide certificate of compliance from authority � <br /> , havi���g jurisdiction indicatin� approval of field acceptance tests. � <br /> � � . <br /> 1.()7 QU�LITY ASSURANCE <br /> . A. Pcrfirm Work in accordance with NF'PA 14. <br /> , Au�ust 25, 1999 15375 - l 99033.00 <br /> i <br /> I <br />