My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 GALL BLVD (61)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 GALL BLVD (61)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 11:42:11 AM
Creation date
4/18/2017 11:39:24 AM
Metadata
Fields
Template:
Building Plans
Street #
7050 GALL BLVD
Location
GALL BLVD
Contractor
POOLE CONSTRUCTION
Description
ADDENDUM #1 ER ADDITION
Owner
EAST PASCO MEDICAL CENTER
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
; ! <br /> . . I .. <br /> � ' • <br /> 1. NFP:\-13. <br /> 2. Local Fire Department. <br /> 3. State Fire N[arshall <br /> 4. City Building Department. <br /> • �. Fire Insurance Rating Bureau. <br /> ; 6. ACHA <br /> 1:04 SUBNIITTAI.S: <br /> A. Refer to Section regarding, Submittals, and be governed accordingly. Prepare and <br /> submit six (6) complete sets of detailed workin� drawings showing equipment, <br /> underground fire service lines, risers, piping an.d heads. These drawings shall be <br /> prepared by an accredited sprinkler installation company's and shall be submitted <br /> to and approved by the Local Fire Department, the Fire Insurance Rating Bureau, <br /> and the Authorities having jurisdiction,prior to submitting to Architect/Engineer. <br /> B. Sprinkler Drawings shall be coordinated with the mechanical and electrical , <br /> , drawings, and the Architects' reflected ceiling plans. Because the drops for <br /> sprinkler heads will be installed before the li�hting, air ducts and air outlets are <br /> installed, the Sprinkler Contractor shall locate the heads so as to avoid interference <br /> � � with such items. Locations for mechanical and electrical items shall have priority <br /> over sprinkler piping. <br /> C. � If this is not feasible within the time frame allowed, Architect/Engineer is to be <br /> ; contacted for further instructions and requirements relative to plan review prior to <br /> ; installation. Authority to commence installation will not be granted until the <br /> j requirements herein noted are satisfied. <br /> � <br /> D. ! Fumish Architect with six (6) sets of accurately marked "a�built" shop drawings <br /> upon completion and acceptance of over-head piping. <br /> 1.05 WIRING: <br /> A. i Division 16 Contractor shall furnish wiring for signal and alarm devices furnished <br /> �by Sprinkler Contractor. ; <br /> i <br /> 1�.06 INSTRUCTION: . <br /> i� A. Furnish typed instructions relative to sprinkler controls, alarm device operations ' <br /> and emergency procedures. - <br /> , nu�ust 25, 1999 15510-2 99033.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.