Laserfiche WebLink
/ <br /> � the �edge group, p.a. OIVNER � <br /> , ARCHITECT D <br /> I 444 BUNK�R ROAD, WEST PALM BEACH CONTRACTOR ❑ <br /> I FLORID�/�3 405-3894 �/686-8307 FIELD ❑ <br /> ,� <br /> � Medical Of�ice Building <br /> CH�NGE OIRDER No. 1 Date: �pL�7��95 ARCHITECTS PROJECT No. 9412 <br /> Own e r: � TO: ._._., <br /> � � ! � � <br /> East Pasco� Medical Center Poole Construction Co. , Inc. <br /> �7050 Ga111Blvd. 544 Douglas Avenue <br />,� �Zephyrhills, FL 33541 � � � Altamonte Springs, FL 32714 <br /> �j � � <br /> You ar�l directed 'to make the following changes in the above project: <br /> The co'st quoted 'includes all labor and material (re: paragraph 4 of General Conditions) necessary to <br /> complete the work� ;as indicated herein and in the construction documents where they apply. Conflicts <br /> will be governed by this Change Order for this part of the work on;ly. <br /> � � , <br /> � ' ! star 4 Revisions: � <br /> I <br /> , ; 1. Add 2 smoke walls as indicated on Drawing A-2, across the <br /> ; building. ' <br /> � 2. Add the following 20 minute doors in the corridors at the smoke <br /> � walls, 07, 29, 51 and 57,, as indicated on Supplementary <br /> ' � Drawings SD-5A and SD-5B, dated Oct. 17, 1995. <br /> I � I <br /> ,� <br /> � � 3. Add Sliding Window Type �'D" in Physician�s offices 14, 21, 43 <br /> I �, �, and 50, as indicated on Drawings A-2 and A-6, revised star 4, <br /> � � �, dated oct. 16, 1995, Emergency Egress. <br /> li <br /> I i <br /> �I 4. The ceiling membrane is to be continuous over partitions as <br /> I � � indicated on Drawings A-7, A-8 and A-9, and on Detail 1/A-7, <br /> � revision Star 4, dated oct. 16, 1995. <br /> � i <br /> /lttachments: c��u attached docvmmb that wpport daxr{ptfon) <br /> Drawings A-2, ;4-3, A-5, A-6, A-7, A-8, A-9, A-10 and A-11, rev. Star 4, Oct. 16, 1995 <br /> I � � <br /> Supp'lementary�Drawings SD-5A and SD-5B, dated Oct. 17, 1995. <br /> � i <br />' BY: <br /> The oTiginal Proj ect� Cost was . . . . . . . . . . . . . . . . . . . . . $ <br /> Net charrg�""by p,revious Change Orders . . . . . . . . . . . . . . . . . $ <br /> The Cost prior to this Change Order was . . . . . . . . . . . . . . . . $ <br /> The Cost will �be (increased) (decreased) (unchanged) <br /> by�this Change Order . . . . . . . . . . . . . . . . . . . . . . . . $ <br /> The niw Cost in�eluding this Change Order will be . . . . . . . . . . . $ <br /> � <br /> i � <br /> � � � <br /> � ; � <br /> � - � i -- -- <br /> The Edge Group,� P.A. East Pasco Medical Center Poole Construction Co. , Inc. <br /> 444 -Bunker Road;l 7050 Gall oulevard 544 Douglas Avenue <br /> West P c � a. 33405 Zephyr ' s, FL 5 Altamonte Springs, FL 32714 <br /> BY� � �r�� BY � BY <br /> � <br /> , ��n�rL _:, �c� !�/',��' i�n�i�� �� /��/c'�99 un�i�r: _ � <br />