/
<br /> � the �edge group, p.a. OIVNER �
<br /> , ARCHITECT D
<br /> I 444 BUNK�R ROAD, WEST PALM BEACH CONTRACTOR ❑
<br /> I FLORID�/�3 405-3894 �/686-8307 FIELD ❑
<br /> ,�
<br /> � Medical Of�ice Building
<br /> CH�NGE OIRDER No. 1 Date: �pL�7��95 ARCHITECTS PROJECT No. 9412
<br /> Own e r: � TO: ._._.,
<br /> � � ! � �
<br /> East Pasco� Medical Center Poole Construction Co. , Inc.
<br /> �7050 Ga111Blvd. 544 Douglas Avenue
<br />,� �Zephyrhills, FL 33541 � � � Altamonte Springs, FL 32714
<br /> �j � �
<br /> You ar�l directed 'to make the following changes in the above project:
<br /> The co'st quoted 'includes all labor and material (re: paragraph 4 of General Conditions) necessary to
<br /> complete the work� ;as indicated herein and in the construction documents where they apply. Conflicts
<br /> will be governed by this Change Order for this part of the work on;ly.
<br /> � � ,
<br /> � ' ! star 4 Revisions: �
<br /> I
<br /> , ; 1. Add 2 smoke walls as indicated on Drawing A-2, across the
<br /> ; building. '
<br /> � 2. Add the following 20 minute doors in the corridors at the smoke
<br /> � walls, 07, 29, 51 and 57,, as indicated on Supplementary
<br /> ' � Drawings SD-5A and SD-5B, dated Oct. 17, 1995.
<br /> I � I
<br /> ,�
<br /> � � 3. Add Sliding Window Type �'D" in Physician�s offices 14, 21, 43
<br /> I �, �, and 50, as indicated on Drawings A-2 and A-6, revised star 4,
<br /> � � �, dated oct. 16, 1995, Emergency Egress.
<br /> li
<br /> I i
<br /> �I 4. The ceiling membrane is to be continuous over partitions as
<br /> I � � indicated on Drawings A-7, A-8 and A-9, and on Detail 1/A-7,
<br /> � revision Star 4, dated oct. 16, 1995.
<br /> � i
<br /> /lttachments: c��u attached docvmmb that wpport daxr{ptfon)
<br /> Drawings A-2, ;4-3, A-5, A-6, A-7, A-8, A-9, A-10 and A-11, rev. Star 4, Oct. 16, 1995
<br /> I � �
<br /> Supp'lementary�Drawings SD-5A and SD-5B, dated Oct. 17, 1995.
<br /> � i
<br />' BY:
<br /> The oTiginal Proj ect� Cost was . . . . . . . . . . . . . . . . . . . . . $
<br /> Net charrg�""by p,revious Change Orders . . . . . . . . . . . . . . . . . $
<br /> The Cost prior to this Change Order was . . . . . . . . . . . . . . . . $
<br /> The Cost will �be (increased) (decreased) (unchanged)
<br /> by�this Change Order . . . . . . . . . . . . . . . . . . . . . . . . $
<br /> The niw Cost in�eluding this Change Order will be . . . . . . . . . . . $
<br /> �
<br /> i �
<br /> � � �
<br /> � ; �
<br /> � - � i -- --
<br /> The Edge Group,� P.A. East Pasco Medical Center Poole Construction Co. , Inc.
<br /> 444 -Bunker Road;l 7050 Gall oulevard 544 Douglas Avenue
<br /> West P c � a. 33405 Zephyr ' s, FL 5 Altamonte Springs, FL 32714
<br /> BY� � �r�� BY � BY
<br /> �
<br /> , ��n�rL _:, �c� !�/',��' i�n�i�� �� /��/c'�99 un�i�r: _ �
<br />
|