Laserfiche WebLink
i � <br />� � - <br />� SECTION 09 66-SHAFT WALL SYSTEM <br /> PART 1 -GE RAL <br />� � <br />� <br /> 1.1 SUBMTPTALS <br /> A. Submit items in accordance with Section 01300. <br /> B. Sub 't four copies of manufacturer's product data, and printed instructions for installing and <br /> � fini�s' ing. <br /> 1.2 CO �RDINATION <br />� I � <br /> A. Co Q�rdinate with other trades required to install work in elevator shafts. Do not install framing <br />! and�uvallboard until metal fabrications and hoistway entrance frames aze installed. <br /> .3 Q ITY ASSURANCE <br />� A. Cor�ply with the detailed Contract Drawings and/or in accordance with state and local codes, if <br /> j mor stringent,for required fire-resistance ratings. <br />�� � co ies of manufacturer's rinted instructions for installin material at the 'ob site for use <br />; B. Have p p g J <br /> by � �orkmen and Architects. <br /> � at'o s sha11 be monitored thorou hl so that the 2 hour inte 't is not violated. <br /> C. All enetr i z� g y, � Y <br />� 1.4 LING AND STORAGE <br />� � <br />; A. Handle material so as to avoid damage. <br />' <br /> B. Sto e materials inside,under cover, in a dry place. <br /> , 1. Stack flat, off of floor. <br />+ � 2. Support boards so that they do not sag. <br />� j 3. Store adhesives and joint material in a warm, dry place. <br />� ' 4. Do not overload floors. <br /> I <br />� <br /> I <br /> i 1.5 JO CONDITIONS <br />� <br /> i <br />� A. Mai tain temperature in areas where work is being performed between 55 and 70 degrees F. for <br />, 24 i ours before, during, and after gypsum board and joint treatment. <br />� <br />� B. Pro ide ventilation during and following application of adhesives and joint treatment. <br />� <br />� C. Pro ect wet applied materials from drying too fast. <br /> i <br />�; <br />� <br /> II " April 17, 2002 09266-1 02016.00 <br />� Revision No� 1 <br />� <br />'j = <br /> 1 <br /> i <br />