My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 GALL BLVD (73)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 GALL BLVD (73)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2017 2:19:06 PM
Creation date
4/21/2017 1:39:26 PM
Metadata
Fields
Template:
Building Plans
Street #
7050 GALL BLVD
Location
GALL BLVD
Contractor
POOLE CONSTRUCTION
Description
ACUTE CARE BED RENOVATION
Owner
EAST PASCO MEDICAL CENTER
Building Plans - Permit #
8030B
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I I <br /> Ip�� I <br /> � <br /> � i <br /> � • � r _ . <br /> I \ �, <br /> I ' I � <br /> ADDENDUM N0. 2 _ <br /> � ' o- 8 <br /> OCTOBER 3 , 1998 � `�� <br /> I <br /> � <br /> i�CUTE C i E BED RENOVATION <br /> �AST PASC�O MEDICAL CENTER <br /> ZEPHYRHIL'LS, FLORIDA <br /> I <br /> I <br />� iOB N0. 98104 . 00 <br /> i <br /> AHCA LO INO. H-0425-AC <br /> I <br /> '�iHOENIX DESIGN GROUP, INC. ; <br /> 04 WOO MONT BLVD, SUITE 218 i <br /> NASHVIL �E, TENNESSEE 37205 ; <br /> �! i <br /> This Adc�endum forms a part of the Contract Documents and modifies , <br /> the original Bidding Documents, dated September 8, 1998, as <br /> outline � here in addition to being shown on the drawings as Delta <br /> 2, date � October 13 , 1998 . � <br /> � <br /> �CHANGES TO THE DRAWINGS , <br /> � <br /> Sheet E 8 - Power & Systems Second Floor: i , <br /> � <br /> - i <br /> 1 . Install a 120 volt, 15 amp, ivory, sing�e receptacle ; <br /> for each of the new fan coil units to be located in the ' <br /> following nine patient rooms : 2-200, 2-202, 2-205, 2- � <br /> I ' 227, 2-230 , 2-235, 2-236, 2-239, 2-240, . The simplex � <br /> r I receptacle shall serve as the means of disconnect for � <br /> � the unit . <br /> Shee� E�11 - Distribution System Riser Drawing & Notes : , <br /> � - <br /> l . � This drawing of the existing power distribution riser � <br /> was incorrectly indicating that existing panel board I <br /> "EL2A" (Life support branch) was being served from <br /> ` panel board "E2B° (Life safety branch) . This drawing <br /> has now been corrected to indicate that panel "EL2A" <br /> (Life support branch) is being served from panel <br /> "EL2B" (Life Support branch) . ' <br /> i <br /> 2 . The available fault current at the existing 120/208V. <br /> � 3-phase, 300KW, emergency generator and subsequently � <br /> � downstream at the essential system distribution panel i <br /> board "EDP�� was shown incorrectly. These calculation <br /> numbers have now been corrected. , <br /> i - END OF ADDENDUM - � <br /> I <br /> I ADDENDUM N0 . 2 Page 1 of 1 98104 . 00 <br /> � <br /> i <br /> I <br /> � <br />� I <br /> b � f <br />
The URL can be used to link to this page
Your browser does not support the video tag.