Laserfiche WebLink
r <br /> � <br /> i <br /> i <br /> � <br /> I <br /> New Sheet E-12 - Third Floor Mechanical Room Plan - ELECT: <br /> 1 . : Due to the proposed enlarged size of new AHU-1 of which <br /> will encroach upon the NEC required front working <br /> clearance. Remove the existing motor control center <br /> i �'EMCCA" in its entirety. Remove the 100 amp enclosed <br /> ; circuit breaker and feeder for panel "EQO" currently <br /> tapped to the "EMCCA" bus . Remove the free-standing <br /> I comb. starter "AHU-2 " , as shown on new drawing E-12 , <br /> dated October 19 , 1998 , Delta No. 3 . <br /> 2 . Install new 400 amp, 120/208V. , 3-phase, MLO, <br /> distribution panel "EQ3 " . This panel shall be served by � � <br /> splicing into the existing 350 amp feeder now serving � , <br /> the motor control center "EMCCA" being removed, as <br /> i shown on new drawing E-12 , dated October 19 , 1998, <br /> Delta No. 3 . <br /> " � 3 . Install new 400 amp, 277/480V. , 3-phase, MLO, <br /> distribution panel, "3HE1" . This panel shall be served <br /> �i by installing a new 225 amp, (4-wire plus ground) <br /> � feeder circuit to the existing 600 amp, distribution <br /> � panel "1HE1" located in the existing, main, emergency, <br /> electrical room. Install a �new 225/3 -pole, type "KA" , <br /> 600V. , Square-D circuit breaker in existing dist . panel <br /> "1HE1" , as shown on new drawing E-12, dated October 19 , <br /> 1998 , Delta No. 3 . � <br /> 4 . Relocate the existing AHU-2, free-standing, combination <br />, _ motor starter and its associated motor feeder. Serve <br />� � starter from new panel "EQ3 " , 200/3-pole CB, as shown <br />' ' on new drawing E-12 , dated October 19 , 1998, Delta No. <br /> � 3 . <br /> 5 . � Relocate the 20 amp, 3-phase, branch circuit for , <br /> ; the existing control air compressor to new panel <br /> i "EQ3 " , 20/3-pole CB, as shown on new drawing E-12, <br /> dated October 19 , 1998, Delta No. 3 . <br /> 6 . Relocate the 100 amp, 3-phase, feeder circuit for <br /> existing panel "EQO" to new panel "EQ3 " , 60/3-pole CB, <br /> as shown on new drawing E-12, dated October 19 , 1998, <br /> i Delta No. 3 . <br /> I <br /> 7 . Install a new 20 HP, 208V, 3-phase, comb. motor starter <br /> and associated conductors and conduit for existing <br /> "AHU-2" fan motor. Serve starter from new panel "EQ3 " , <br /> �, 200/3-pole CB, as shown on new drawing E-12, dated <br /> � October 19 , 1998 , Delta No. 3 . <br />' � DENDUM'N0. 3 Page 2 of 3 98104 . 00 <br /> �� <br />