Laserfiche WebLink
. I <br /> .- , � <br /> � <br /> �_. , - <br /> ' y' I _ <br /> � I I <br /> REVISION NO 1 _ <br /> � ; i r ��,� <br /> NOVEMBER l, 1999 �\� � <br /> � <br /> E.R. RENOiATION AND ADDITION <br /> EAST PASCO MEDICAL CENTER <br /> ?EPHYRHIL';LS, FLORIDA <br /> � i <br /> ESa PROJECT NO. 99033.00 <br /> This Revision forms a part of the Contract Documents and modifies the original Bidding <br /> ]�ocuments, dated August 25, 1999, as outlined here in addition to being shown on the drawings <br /> as Delta 2, dated November 1, 1999: <br /> I <br /> CHANGES TO THE DRAWINGS <br /> ; � <br /> ' Sheet A-7, Fiist Floor Plan—Noted and Dimensioned: <br /> . 1. Add three more admissions stations to the original scope of work and add an operators <br /> station as indicated in the enclosed Sheet A-7, dated November 1, 1999, Delta No. 2. <br /> 2. Add two exam rooms and relocate the wheelchair storage space as indicated in the <br /> enclosed Sheet A-7, dated November 1, 1999, Delta No. 2. <br /> Sheet A-8, Slecond Floor Plan—Noted and Dimensioned: <br /> � <br /> 1. Incorporate the cath lab film file storage and pathologist's office as indicated in the <br /> enclosed Sheet A-8, dated November 1, 1999, Delta No. 2. <br /> . <br /> Sheet A-9, Roof Plan: <br /> 1. Incorporate the location change to the exhaust fan as indicated in Sheet A-9, dated <br /> � November 1, 1999, Delta No. 2. <br /> � <br /> Sheet A-15, Large Scale Plans: <br /> 1. Incorporate the casework elevations into the drawings as indicated in the enclosed Sheet <br /> � A-15,�dated November 1, 1999, Del�ta No. 2. <br /> � <br /> Sheet A-21, First Floor Plan—Reflected Ceiling: <br /> 1. Incorporate the ceiling changes as required for the new admissions stations, operator <br /> station and the new exam rooms. These changes are indicated in the enclosed Sheet A- <br /> 21, dated November 1, 1999, Delta No. 2. <br /> ; i <br /> --� i <br /> �- REVISION i O. 1 PAGE 1 JOB NO. 99033.00 <br /> s i <br /> ' I <br /> _` I <br /> I i � <br />