Laserfiche WebLink
I�OWE'S OF ZI PHYRHILLS,FL 06/02/2003 <br />' � D. Metal Protection: Where aluminum will contact dissimilar metals, protect against galvanic action by <br /> ; painting contact surfaces with primer or by applying sealant or tape recommended by manufacturer for this <br /> purpose. Where aluminum will contact concrete or masonry,protect against corrosion by painting contact <br /> surfaces with bituminous paint. <br /> � E. Entran�ces: Install entrances plumb and true in alignment with established lines and grades without warp or <br /> rack of framing members and doors. Anchor securely in place. Lubricate operating hardware and other <br /> movmg parts. <br /> 1. Install surface-mounted hardware using concealed fasteners to greatest extent possible. <br /> 2. Install components to drain water passing joints and condensation and moisture occurring or migrating <br /> within the system to the exterior. <br /> F. Door Operators: Install door operator system,including control wiring. Refer to Division 16 Sections for <br /> connection to electrical power distribution system. <br /> G. Activation and Safety Devices: Install control devices and wiring,including connections to door operators, <br /> as follows: <br /> 1. Mo�tion Detectors: Install scanners on both interior and exterior sides of each sliding automatic <br /> entrance door. <br /> 2. Infrared Threshold Presence Detectors: Install scanners on both interior and exterior sides of each <br /> sli�ding automatic entrance door as indicated. <br /> H. Glaziri�� Comply with installation reyuirements in Division 8 Section "Glazing." <br /> I. Sealarits: Comply with requirements in Division 7 Section "Joint Sealants" for installing sealants, fillers, <br /> and gaskets. <br /> 1. Se�t continuous sill members and flashing in a full sealant bed to provide weatlErtight construction. <br /> 2. Se�a'1 frame perimeter with sealant to provide weathertight construction. <br /> J. Adjusting: Adjust door operators, controls, and hardware for smooth and safe operation and for <br /> weathertight closure. <br /> 3.02 FIELD QUALITY CONTROL <br /> A. Inspection: After completing installation, an inspector certified by the American Association of Automatic <br /> Door Manufacturers shall test and inspect each automaric entrance door for compliance with applicable <br /> ANSUBHMA standards. <br /> l. Inspection Report: Submit report in writing to Owner and Contractor within 24 hours after inspection. <br /> B. Repair�or remove and replace Work that does not comply with requirements. <br /> 3:03 DEMO STRATION <br /> A. Engage manufacturer's inspector certified by the American Association of Automatic Door Manufacturers <br /> to train Owner's maintenance personnel to adjust, operate, and maintain automatic entrance doors and <br /> operator . <br /> END OF SECTION 08461 <br /> � <br /> � ' <br /> - � <br /> : ., <br /> � . <br /> SLIDING AUTOMATIC ENTRANCE DOORS 08461 -5 <br /> Revision#3, OSl 6/04 i <br />